Loading...
RC Townhomes-CS041014October 14, 2004 Jason R. Rose Coppell Townhomes, LLC 410 Spinnaker Drive Allen TX 75013 RE: Riverchase Townhomes Dear Mr. Rose: A pre-construction conference on the referenced project has been scheduled for Tuesday, October 19, 2004 at 2:00 p.m. in the second floor conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Since ~/~ t Larry Davis, Constmc ion Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal See Page 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner / owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the following parties: · Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) · Geotechnical firm · Project Engineer · Bonded (or bondable) contractors or subcontractors for excavation, utilities including water, sewer & storm drain, paving operations, subgrade modification or lime stabilization, and residential erosion control · SWPPP representative