Loading...
WA0101-CN040914· BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 JOHN W BIRKHOFF, PE RONALD V. CONWAY, PE GARY C HENDRICKS, PE JOE R. CARTER, PE PAUL A CARLINE, PE. MATT HICKEY, PE DOUGLAS K SHOWERS, P E Dallas, Texas 75231 Fax(214) 361-0204 September 14, 2004 Phone (214) 361-7900 Mr. Kenneth Griffin, P.E. City Engineer/Director of Public Works City of Coppell P. O. Box 478 Coppell, Texas 75019 State Highway 121 Water Line Additional Scope of Work Engineering Services Agreement - Amendment No. 1 Dear Mr. Griffin: Pursuant to our meeting on Thursday September 9, 2004, we have reviewed the scope of work required to prepare an additional plat and field note description for the easement associated with tying the proposed water line to the existing 8-inch water line at the east property line of the Magnolia Park Co. Ltd. property. We have also reviewed the scope of work to add this to our plans and specifications package. The area affected by this change is illustrated on the attached Exhibit I. The change in scope items are listed below: Field survey services to locate existing 8-inch line and establish the location of valves to ensure constructability, Field survey services to establish location of existing property boundary monumentation to be utilized in the preparation of plat and field notes, Addition of a permanent easement and temporary construction easement across the Magnolia Park property, and Addition of the plan and profile for the additional 35-feet of 8" water line connecting the existing 8- inch to the proposed 12-inch lines. In regards to the Engineering Fees to design this addition to the project, we offer the following breakdown: Design ......................................................... additional $900.00 lump sum Construction ................................................ no change Contract Administration ............................. no change Field Survey ................................................ additional $375.00 lump sum Plat and Field Note Preparation .................. additional $900.00 lump sum Mr. Kenneth Griffin, P.E. City of Coppell September 14, 2004 Page 2 of 2 We request this contract amendment in the amount of $2,175.00 to cover the additional engineering services to add this 8-inch water line connection to the existing 8-inch line. If you are in agreement with this contract amendment, please have one copy executed on behalf of the City of Coppell and returned to our office. l~s K. S'tro~vers, P.E. APPRO~HE CITY OF COPPELL