Loading...
WA0002-CS041017DALLAS COUNTY October 7, 2004 Jay Louy, Principal North Texas Contracting, Inc. P.O. Box 468 Keller, TX 76244 Attention: Vem Franklin, Estimator CDBG FY 2002 Coppell Fire Hydrants & Water Mains Project Golden Triangle Mobile Home Park Construction Contract- Contrnet Time ond Flowoble Bneld'dl Costs Dear Mr. Louy, Per my discussions with Veto Franklin, Project Manaser of your staff, Contract Timm stopped on Wednesday, August 25, 2004, for the referenced project. Wi~h the Conunence of Construction date being July 6, 2004, the respective Elapsed Project Time is 51 Calendar Days out of 60 Calendar Days. Also, atlached are Team Consul~mts' concrele slrength reports for Water Line "W-2" Flowable Backfill which are briefly summarized ns follows: ~ ~ Break $+~0 August 2, 2004 15-Day 2+50 August 3, 2004 14-Day 2+00 August 4, 2004 T-Day 1408 August 4, 2004 13-Day Ave. Strength 28-Day l;)atg ~ 274 psi August 30, 2004 279 psi 245 psi August 31, 2004 270 psi 100 psi September l, 2004 185 psi 942 psi September 1, 2004 1,139 psi Only one (1) out of four (4) locations met / exceeded the required minimum 28-day compressive sUen~h of 500 psi. As stated in the August 23, 2004 leU~r from the Dallas Counly Publio Works Department to the City of Coppell reoarding same, a reduction in the Total Unit Price for Bid Item No. I-7, Elownble Backfill, shall be negotinred. Please submit the raw material cost (prior to your overhead and profit eom) of the Flowable Backfill by documentation to InMate suoh negutlotionm. We look forward to a proper resolution of this outsumding item for the CDBO FY 2002 Coppell Fire Hydrants & Water Mains project. Should you have any ciucstions, please feel free to call me. Sincerely Abel V. Salda~a, P.E. Project Manager 411 Elm Street, 4'h Floor Dallas, Texas 75202 214-653-7151 Fax 214-653.6445 Mr. Louy October 7, 2004 Pa~e Two Al~a~hitlenls Donald R. I.{olzw~, P.E., Direclor, DaIIM Co~mty Public Worlu Alberta Blair Robinson, P.E.~ Assistant Director, D~llas Count)' Public Works, Engineering & Conltmctlon DIv, Rick Lo~ssberL Director, Dallas County Pit, ming & Dcvelopmem Al DomiMuez, Senior Constzuction Inspector, Dallas Co~ty Public Works Kenneth Grifl'm, P.E., D~ctor, En~lneerln~ end Public Works, City ot'Coppell Dave Pre. jean, Senior V.P., Operations ~ervices & SWAT D~tor, Affordable Residential Communities word fll~ CoppoJi~FHs&WmerMeins,,NoTxCo~a~tlnl Con~Tlmc&Plowsbl,~B(,~kfillCo~, 10072004 TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing CONCRETE STRENGTH REPORT (ASTM C-39), (ASTM C-78), (AS'I'M C-298) OR (TEX-4I 8-A), (TEX-d48-A) Mr. Able Saidana, P,E. DATE: 09/04/2004 REPORT NO.: I/6 Dalla~ County Public Worl~ JOB NO.: 045086 al 1 Elm Street. 4m Floor Della~, TX 45202 PROJECT: FY2002 Golden Triangle Mobil Home Park Fire Hydrants and Water Mains Orant No. B.02-UC-480003 Cyl er Slump(la.) Alt (%) Streu~h"' (l~ell Beam Date Date ASTM ASTM 28-Day ~o. LOcation Break Made (C-143~ (C-23D T-Day 2f-Day 'So~s. 1- A Backfill for water utilities, 08/I 1 08/0a .... (100) -- B sra. 2+00 09/01 08/04 180 C 09/01 08/04 190 'L: REMAIt]~: Flowable Fill Iff 2~70 $. Wulton ~dker, Suite 101 Dallm', TX 75211 3101 Plett.~attt ~tlley Sidle I01 Adi.gtmt. TX 76015 By: 1214) 331-4395 ~817) 467.3500 TEAM Cousultauts, Tifffmy WoOley Fox (214) 351.4458 Fax (817) 46~.9920 wd o~:t,o ~,o-zo-l~o