Loading...
SS9901-CS041025COPPELL October 25, 2004 Mr. Richard Gee GEE Consultants 10046 Monroe Drive Dallas, Texas 75229 DeForest & Sandy Lake Wastewater Lift Station Improvements SS 99-01 Construction Materials Testing Dear Mr. Gee: Enclosed please find a set of plans and specifications for the above referenced project. The project consists of the demolition of the existing l 1.2 MGD DeForest Wastewater Lift Station and construction of a new 14.4 MGD submersible lift station, and demolition of the equipment from the existing 9.9 MGD Sandy Lake Wastewater Lift Station and the construction of a new 4.3 MGD lift station within the existing lift station structure. The City of Coppell awarded a construction contract to Can-Fer Construction Company on October 12, 2004. Please provide an estimate of the type and number of construction materials tests required for the project based on the construction plans and the City's standards, and submit an agreement for the testing. The contractor is responsible for payment of materials testing done before 8:00 a.m. and after 5:00 p.m. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suzari ~ Taylor C.I.P. Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 Email: stavlor~ci.coppcll.tx~ us