ST9301-CS041025October 25, 2004 Mr. Richard W. Gee, P.E. Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 Sandy Lake Road / ST 93-01 Construction Materials Testing Request For Proposal T H £ C [ T Y 0 F' CO?FELL Dear Mr. Gee: The City of Coppell intends to reconstruct 4234 linear feet of Sandy Lake Road, from Kimbel Kourt to the east city limits. The existing two-lane asphalt roadway will be replaced with a four-lane divided, concrete roadway with improved storm drainage. The elevation of the road will be raised an average of four feet to remove the proposed roadway out of the floodplain. Construction of the project will be phased and temporary special shoring and HMAC detours installed to allow for two-way traffic during the duration of construction. The project also includes the installation of 652 linear feet of 10' x 8' box culvert and 10,116 square yards of concrete block retaining wall. The project bid opening is November 16, 2004 and construction is anticipated to start in the Ist quarter of 2005. We arc requesting your firm, along with four other firms, to submit a proposal for the construction materials testing on the Sandy Lake road project. An estimate of the type and number of construction materials tests required for the project is enclosed for your use in preparing the proposal. Please submit the proposal within the next three weeks. The city will select one firm for the materials testing based on thc proposals. Do not submit a materials testing cost for the project with the proposal. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suza~ q Taylor C.I.PSC~ordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stavloff~ci .cop~ell.t x. u s Attachments 255 PARK WAY ~ P O B©X 947B * COPPELL TX 75019 ~ TEL 9727462 0022 ~ FAX 972/304 3673 COPPELL October 14, 2004 Mr. Bruce Walton QA/QC Supervisor Team Consultants, Inc. 2970 S. Walton Walker Boulevard, Suite 101 Dallas, Texas 75211 Sand>, Lake Road / ST 93-01 Construction Materials Testing Request For Proposal Dear Mr. Walton: The City of Coppell intends to reconstruct 4234 linear feet of Sandy Lake Road, from Kimbel Kourt to the east city limits. The existing two-lane asphalt roadway will be rcplaced with a four-lane divided, concrete roadway with improved storm drainage~ Thc elevation of the road will be raised an average of four feet to remove the proposed roadway out of the floodplain. Construction of the project will be phased and temporary special shoring and HMAC detours installed to allow for two-way traffic during the duration of construction. The project also includes the installation of 652 linear feet of 10' x 8' box culvert and 10,116 square yards of concrete block retaining wall. The project bid opening is November 16, 2004 and construction is anticipated to start in the Ist quarter of 2005. We arc requesting ),our firm, along with two other firms, to submit a proposal for thc construction materials testing on the Sandy Lake road project. An estimate of the t)~pe and number of construction materials tests required for thc project is enclosed for your use in preparing the proposal. Please submit the proposal within the next threc weeks. The city will select one firm for the materials testing based on thc proposals. Do not submit a materials testing cost for the project with the proposal. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suzan~. Taylor C. 1P. Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: st~xlor ctic~ coppcll.tx us Attachments Mr. Keith E. Atkins CMT Project Manager Reed Engineering Group 2424 Stutz, Suite 400 Dallas, Texas 75235 Mr. Mark Gray Rone Engineers 8908 Ambassador Row Dallas, Texas 75247 ST 93-01 SANDY LAKE ROAD (KIMBEL KOURT - E. CITY LIMITS) MATERIALS TESTING ESTIMATE SITE PREPARATION Approximately 67, 533 C. Y. of fill material. (Assumed I FDT per 8" lift ~ 300') Station IPr°p°sed IExisting IFill Height INumber 27+00 450.17 445.5 4.67 7 30+00 449.64 445.25 4,39 7 33+00 449.29 445 4.29 6 36+00 449,79 445 4.79 7 39+00 449.14 445 4.14 6 42+00 449.65 445 4.65 7 45+00 448.38 445 3.38 5 48+00 448.55 445 3.55 5 51+00 448.67 445 3.67 5 54+00 450.36 445.4 4.96 7 57+00 449.86 446,2 3.66 5 60+00 450.06 446 4.06 6 63+00 449.56 445.9 3.66 5 66+00 448.96 446.6 2.36 4 INuclear Density Test Standard Proctor Test Atterberg-limit Test MECHANICAL LIME STABILIZATION Approximately 32, 588 S. Y. ( 4234 L.F.) of subgrade will be mechanically lime stabilized. (Assumed 3 FD T for each 300 L.F.) x 2 phases lend Sta. IBeg. Sta. ILength INumber I 6644 2410 4234 85 Nuclear Density Test 85~ Standard Proctor Test Atterberg-limits Test Gradation 25~ 84 CONCRETE TESTING (Assume I set of 4 cylinders each 150 C. Y.) Pavement Is.¥. IC.Y. INumber of sets/+25%) I 30,603 6834.67 57 6" Curb IL.F. IC.Y. INumber of sets I 15072 139.56 1 RipRap Ic.Y. I [Number of sets ] 511 3 6" Concrete DrivewayslRampslSidewalkslS"Stamped Concrete Is'y' Ic'y' INumber °f sets I 1638 273 2 142 23.67 1 3030 505.00 3 933 208.37 1 Handpours IStructure lEACH ]Number of sets J Inlets 22 13 Strm. Sewer MH 11 7 Headwall 17 6 S.S. Manhole 1 1 St Lgt. Foun. 25 3 Ret. Wall Ftgs. 4 2 Box Culvert 2 (assume another 25% for hand-pours) (assume 5/day and 3 pours per inlet) (assume 2/day) (assume 3/day) (assume 8/day) UTILITIES Assumed I FDT per 8"lift ~ 300' 102 Sets 408 Cylinders ISTORM SWR JLENGTH IAVG. DEPTH INUMBER ] 18" RCP 572 4 6 21" RCP 1312 4 26 24" RCP 565 5 14 27" RCP 56 8 12 30" RCP 187 4 6 33" RCP 184 6 9 36" RCP 85 3 4 48" RCP 688 6 21 98 Nuclear Density Test Standard Proctor Test Atterberg-limit Test