Loading...
Freeport NIP(8.0)-LR041025Roi Client: Project: ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF CYLINDER COLLECTION Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Report No.: 221085 Project No.: 049245 Date of Service: 10/20/2004 Report Date: 10/25/2004 Services: Cylinder Collection Report of Collection On this date, a Rone Engineers, Ltd. representative ar~ to pick up compressive strength test spe~or to this date. Technician Time: 10:15am - 12:00pm Page 1 of 1 Technician: Jason Astiz Report Distribution: (I) Duke Realty Services, LP ( 1 ) Extranet (1) City of Copp¢ll (1) City of Coppell Rone Engi~rs] Ltd. .~,~,~ K. Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maim' provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they axe addressed and shall not be reproduced except in full without the wri'aen approval of Rone Engineers, Ltd. 99TM Pace I of 1 Client: ineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Repo~ No.: 219092 Pr~ect No.: 049245 Date ofService: 09/23/2004 Repo~ Date: 10~5/2004 Project: Freeport XI & XII Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compresslve strength samples and bnng samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CO~rRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star pLier: 27 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5"-7" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C- 1231 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9337 PLACEMENT DATE: 09/23/2004 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 1:15pm BATCH Tiara: NA TEMPERATURE (F) - AIR 84 F CONCRETE: 87 F TRUCK NO: 8 TICKET NO: 362677 AiR CONTENT (%): NA t~IT WEIGHT (pci): NA OVERALL pLACEMENT LOCATION: Piers, see report #219091 MEASURED SLUMP (inches) SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" F-1.5/F-I/D5-1/C.8-1 MAXIMUM COMPRESSIVE CYLINDER MARKED DATE AGE DIAMETER . AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 09/30/2004 7 6.00 28.26 92480 3270 Unbonded Cap 1 2 10/21/2004 28 6.00 28.26 128450 4540 Unbonded Cap 1 3 10/21/2004 28 6.00 28.26 127730 4520 Unbonded Cap Average 4530 1 4 Hold See report %219091 for technician time. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality earance crformance, ete ) or any other feature of s m lar subject mat~er provided bY Pers°ns °r c°nd ti°ns °vvr which we have n° e°ntr°l' Our letters and (composition, app ' P - ' ................ n-~d ex-~t in fi~ll without the written approval of Rone Engineers, Ltd. 01HG Page 1 of 2 Report No.: 219092 RoneEngJneers Project No.: 049245 Client: Duke Realty Services, LP l~ll Water added at site: 16 gallons Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Extranct (1) City of Coppell (1) City of Coppall Started: Finished: K. Scott Watson, ~ET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con~'ol. Our letters and reports ave for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01HG Page 2 of 2 ineers 8908 Ambassador Row, Dallns, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (2141 630-9745 REPORT OF REINFORCING STEEL INSPECTION Client: Duke Realty Services, LP Mr. Brian Straley ~ 5495 Belt Line3&, ~ Projeet~ Services: Reinforcing Steel Inspection Report No.: 221131 Project No.: 049245 Date of Service: 10/20/2004 Report Date: 10/25/2004 Report of Inspection On this date, a Rone Engineers, Ltd. scheduled to perform a Reinforcing Steel Inspection. Technician ~i~: 4: 00p~.m~ Page 1 of 2 Technician: Jason Astiz Report Distribution: (11 Duke Realty Services, LP (11 Extranet (11 City of Coppell (11 City of Coppell representative(s) arrived on site as The results are attached. ~ Rone En~nee~_~ta.~ / ~ Law~6~ence Bracken CMT Division Manager LIMITATIONS: The test results presented herein were prepared breed upon the specific samples provided for testing. We assume no responsibibty for variation in quality (composition. appearance, p~rformance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lettem and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriRen approval of Roue Engineers, Ltd. 99TM