Freeport NIP(8.0)-LR041025Roi
Client:
Project:
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF CYLINDER COLLECTION
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Report No.: 221085
Project No.: 049245
Date of Service: 10/20/2004
Report Date: 10/25/2004
Services: Cylinder Collection
Report of Collection
On this date, a Rone Engineers, Ltd. representative ar~
to pick up compressive strength test spe~or to this date.
Technician Time: 10:15am - 12:00pm
Page 1 of 1
Technician: Jason Astiz
Report Distribution:
(I) Duke Realty Services, LP
( 1 ) Extranet
(1) City of Copp¢ll
(1) City of Coppell
Rone Engi~rs] Ltd.
.~,~,~ K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject maim' provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they axe addressed and shall not be reproduced except in full without the wri'aen approval of Rone Engineers, Ltd.
99TM Pace I of 1
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Repo~ No.: 219092
Pr~ect No.: 049245
Date ofService: 09/23/2004
Repo~ Date: 10~5/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compresslve strength samples and bnng
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CO~rRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
pLier: 27
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
5"-7"
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9337
PLACEMENT DATE: 09/23/2004
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 1:15pm BATCH Tiara: NA
TEMPERATURE (F) - AIR 84 F CONCRETE: 87 F
TRUCK NO: 8 TICKET NO: 362677
AiR CONTENT (%): NA t~IT WEIGHT (pci): NA
OVERALL pLACEMENT LOCATION:
Piers, see report #219091
MEASURED
SLUMP
(inches)
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
F-1.5/F-I/D5-1/C.8-1
MAXIMUM COMPRESSIVE
CYLINDER
MARKED DATE AGE DIAMETER . AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 09/30/2004 7 6.00 28.26 92480 3270 Unbonded Cap
1 2 10/21/2004 28 6.00 28.26 128450 4540 Unbonded Cap
1 3 10/21/2004 28 6.00 28.26 127730 4520 Unbonded Cap
Average 4530
1 4 Hold
See report %219091 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
earance crformance, ete ) or any other feature of s m lar subject mat~er provided bY Pers°ns °r c°nd ti°ns °vvr which we have n° e°ntr°l' Our letters and
(composition, app ' P - ' ................ n-~d ex-~t in fi~ll without the written approval of Rone Engineers, Ltd.
01HG Page 1 of 2
Report No.: 219092 RoneEngJneers
Project No.: 049245 Client: Duke Realty Services, LP l~ll
Water added at site: 16 gallons
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Extranct
(1) City of Coppell
(1) City of Coppall
Started: Finished:
K. Scott Watson,
~ET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con~'ol. Our letters and
reports ave for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01HG Page 2 of 2
ineers
8908 Ambassador Row, Dallns, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (2141 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Client: Duke Realty Services, LP
Mr. Brian Straley ~
5495 Belt Line3&, ~
Projeet~
Services: Reinforcing Steel Inspection
Report No.: 221131
Project No.: 049245
Date of Service: 10/20/2004
Report Date: 10/25/2004
Report of Inspection
On this date, a Rone Engineers, Ltd.
scheduled to perform a Reinforcing Steel Inspection.
Technician ~i~: 4: 00p~.m~
Page 1 of 2
Technician: Jason Astiz
Report Distribution:
(11 Duke Realty Services, LP
(11 Extranet
(11 City of Coppell
(11 City of Coppell
representative(s) arrived on site as
The results are attached.
~ Rone En~nee~_~ta.~
/ ~ Law~6~ence Bracken
CMT Division Manager
LIMITATIONS: The test results presented herein were prepared breed upon the specific samples provided for testing. We assume no responsibibty for variation in quality
(composition. appearance, p~rformance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lettem and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriRen approval of Roue Engineers, Ltd.
99TM