Loading...
Freeport NIP(8.0)-LR041020Client: ineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 218756 Project No.: 049245 Date of Service: 09/20/2004 Report Date: 10/20/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: SouthelTl Star PLANT: 27 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5" - 7" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MIX DESIGN I.D.: 9337 PLACEMENT DATE: 09/20/2004 WEATHER CONDITIONS: Clear TIMESAMI'LED: 3:05pm BATCHTIME: NA TEMPERATURE (F) - AIR 92 V CONCRETE: 93 E TRUCK NO: 924 TICKET NO: 362554 AIR CONTENT (%): NA t~rr WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Piers: see report #218755 MEASURED SLUMP (inches) 6.0 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" B~3/B-4/B-5/B-6 CYI. INDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE ! 1 09/27/2004 7 6.00 28.26 97470 3450 Unbonded Cap 1 2 10/18/2004 28 6.00 28.26 129250 4570 Unbonded Cap 1 3 10/18/2004 28 6.00 28.26 127380 4500 Unbonded Cap Average 4540 1 4 Hold See report 4218755 for technician time. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing, We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. )IHG Page 1 of 2 Report No.: 218756 RoneEngineem Project No.: 049245 Client: Duke Realty Services, LP Water added at site: Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Extranet (1) City of Coppell (1) City of Coppell 5 gallons Started: Finished: , t K. Scott Watson, 3~ET CMT Operations Manager LIMITATIONS: The test results p~sented herein were prepared based upon the specific samples provided for testing. We assume no r~sponsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01HG Page 2 of 2 'neers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 218844 Project No.: 049245 Date of Service: 09/21/2004 Report Date: 10/20/2004 Project: Freeport XI & XII Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and teeing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%}: TEST METHOD: CONTR~CTOm Duke Construction CONCRETE SUPPLIER: Southern Stat ?L~¥r: 29 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5" - 7" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 933 7 ?LACEMENT DATE: 09/21/2004 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 4:15pm BATCH TIME: NA TEMPERATURE (F)- AIR 89 F CONCRETE: 92 THUCK NO: 1885 TICRET NO: 371332 AIR CONTENT (%): NA ~rr WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Piers: sec report #218843 MEASURED SLUMP (inches) 7.0 SAMPLE LOCATION: REPORT OF TESTS .... x 12" Concrete Compressive Cyhnder 6 D-8/D-7/D-6/D-5 MAXIMUM COMPRESSIVE CYLINDER MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) Obs. force) (psi) TYPE 1 1 09/28/2004 7 6.00 28.26 87660 3100 Unbonded Cap 1 2 10/19/2004 28 6.00 28.26 113460 4010 Unbonded Cap 1 3 10/19/2004 28 6.00 28.26 109720 3880 Unbonded Cap Average 3950 1 4 Hold See report #218843 for technician time. LIMITATIONS: The test results presented herein were prapawd based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mat~er provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~11 without the written approval of Rone Engineers, Ltd. n~ Page 1 of 2 ~.eport No.: 218844 ?roject No.: 049245 Client: Duke Realty Services, LP Water added at site: 10 gallons Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP ( 1 ) Extranet (1) City of Coppell (1) City of Coppell Started: Finished: CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maner provided by persons or conditions over which we have no contxoL Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, 0IHG Page 2 of 2