Loading...
Coppell Comm 1R3-CS041027COPPELL P.O. Box 9478 255 Parkway Blvd Coppell, TX 75019 Phone:(972)304-3679 Fax:(972)304-7041 ENGINEERING DEPARTMENT FAX COVER SHEET To: Rez Samari From: Larry Davis Fax: 972/318-5298 Date: October 27, 2004 Phone: Pages: 1 (including cover sheet) Re: Royal Park CC: Keith Marvin, P,E [] Urgent []For Review [] Please Comment X Please Reply [] As Requested .Comments: Rez, please provide a submittal that is specific to this project and the material placed. 0000 HO TO 9N 199WD 9N I ~33N I ~N3 ~SO ,, ~, 00 £U: ST A~/OT 17nsB~ SB~Ud BGOW G I NO I ±U±S ±NU±S I G BW I ±-~' S '±d30 '~9N3 993ddOD ~0 A±ID=OI NOII W I NOD Bg SSBW YOU DO NOT ~CEIVE AL OF mE PAGES PLEASE C~L ~7~ 304-3679 "City of Coppell Engineering - Excellence By Design" 11:18 '9?2 ~54 0913 OSP ENGiNEERIHG a 99?250455?0 ~ :.k ~r~in~r'[~g a,~d p~anning F~',- .~7~ 31 $ N0.027 - _. veriz. _n'.: . 14.4K [] Urgent ~ F~ n ple~,e cc~'.'n,~rt [] Please Reply ~1~ Designation: C 857 - 95 Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures1 l.! ~ practice d~scfib~ ~e mlmmum ~ Io~ [o ~ appE~ whea d~i~S monodic or ~x ~vc~. and ma~n~ ~ve~ ~ S~on C 478 ~clud~ ~om ~ N~ ~--g~ ~on~ iMo~6on ~ ~0 S~ S~- ~ou for ~y ~ F~n~ 1.2 ~c v~u~ ~ in ~cb-~und for ~o~a~oa 1,3 Thzs standa~ doe~ no: pu~oa to ~dress all of ~e safet~ conce~. ~ ~. ~s~iated with its ~e It ~ the respo~ibility of the ~er of chis standard to establish app~ bilit~ of real. ow limaatio~ prior to ~e. 2. R~fer~nc~ ~ I A~M Standard' C 478 S~fion for Pr~ ReiaCo~d Coa~cte M~- hole ~o~~ 2.2 ~HTO Sta~ard: S~on Cot Hi.way B~dg~, Fifleea~ 3. Te~ol~ ~.I Descriptions of T~ $pec~c to This $landard: 3.i. l dead Ioa&~ co~ of any other Io~ 3, 1.2 five Ioa&~ cons]st of any mo~ng loa~ ~at ~ ~e design of ~e ~m~u~ ~d ~e~ ~a~d impa~ and surch~e loads. 3.1.3 ulilit~ $t~cture~a ~ ~at ~ u~d by ~. ¢ommum~tlou, or simE~ 4. Dea{~ ~ad~ 4. l R~f The de~i~ loz~ for ~e roof of any at or ~low ~und level eonsis~ of the ~ve loa~ impact and dead [oa~ that ~a develop ~ a resMt such a~ uaed (or roadways and walkwayx 4. I.t L~ve ~The vehicle and I:~/ealfian toad d~ig- ~6o~ ~ ~n ~ Table L Live I~d wh=l ~a~ni ~ 4.1.2 Im~t: 4.1.2.1 ~e ~ve loa~ A-16, A-12, ~d A-8 ~o~d ~ ~ ~ fogo~ to s~a ~e ~ of impaq: 4.1,2.2 ~ve ~ Incre~e: 0 ~o 12 in. (0 to 305 mm) ~low ~ound level, 30 ~ 13 ~ 24 m. (330 to 610 mm) ~low ~ound level, 20 ~ ~5 to 35 in. (635 to 889 mm) ~low ~oua~ I~v~l. 10 % 36 ia. (914 mm} or more ~low ~und level. 0 % 4.1J DeM ~ Io~ ~ co~t of ~e wei~t of ~e r~f, road~, w~ays. ~ f~, a~ o~mng ~ve~. dud any o~er mate~ t~t pr~u~ a ~fie load, 4.1.3.1 R~mmended unit wei~ of matefi~a for d~ 4.l ,4 Distrlb~on of Wheel ~ads Though Earth FiI~: 4. l.4. [ ~l loa~ at ~uad level ~ould ~ co~de~ app~ed to a ~hcet lo~ mca ~ laP,ted m Fig. 2(A) 4.[.4.2 ~1 loa~ should ~ ~buted ~low ~ound level ~ a ~ p~mid. ~ ~o~ ia ~g. 2(B). in w~cb ~e top suffa~ b ~ wh~l load ~ and the ~bu~ load D~ - ~but~ 10~ ~ ~a(m=) L ~ ~h~[ [o~ len~. ~ (m). and - 4.1.4.3 ~ea ~ve~ ~stfibuted load ~ overlap. ~e to~ load s~ ~ consider~ ~ uni~o~iy ~fibut~ over · g ~ defia~ by ~e ou~ide ~mi~ of the in~du~ ar~ ~ iadicat~ in Fig. 2(C). ~en ~e ~mensioas of the ~m-~si~ ~buted toad ~a excee~ the mol ~ea only that ~nion of the ~stfibuted load on the mol ~a sh~ & co~idcred ia ~e design. 15:18 OSP ENGINEERING a 99?230455?0 ~,n ~>? Q05 I~ CS57 4. L4,4 The dJs~ribudou of wheel loads ~,rough eax~h fill may ~ ne~ected when the d~th of~ exc~ds 8 ff (2.5 m). 4.2 Walls~e d~gn loa~ for the ~s of~y ~cture at or ~low gound level will con~ of suture loads resu}fing from live loa~. d~d Ioa~ ~t c~ develop = a r~ult of ~h pre.ute, hydr~tic proud, and co~c- a live load sutchaxge pressure of not te.~ than 0.$ % of the wheel loading oi* the tm~c involved $~ould ~ taken ~s the ~ve load a~ing upon ~e w~ or the 4 2 1.2 Surch~c pr~ur~ for va~o~ live Ica& fe~d to equiv~n~ hofizont~ flgzd or,sure ~e ~ A.16 16 ~ lb~ wheel x 0.~5 ~ 80 lb~/fl: (3830 ~on matefiab such ~ ~ for road~ and ~ays. Load - w...L~[ - ~ ~ Pa~ ~amsofliveload su~h~geandde~toa~o~ ~12 12 ~lbf~rwheelX 0.~5 =601b~/g (.873 4.2.1 L[v~LO~ A-8 8 ~lbfp~whee~x0,005 ~401b~/~2(1915 Pa) ~ 42. I.I ~en t~t~c ~ come ~n a h~On~ d~nce ~r wheel fro~ the st~um equ~ to one h~f ~ Refer to 4 2 2 t  ofmc s~urc. A~,3 10/26/2004 15;18 OSP ENGIUEERING ~ 9 72~045570 857 F3G. 2(A) Whe~l Load Atom FIG. 2(8) Oi~t~b~e~ Load Area 4.2.1.3 Surcharge pressures resulting from live loads may be neglected when thc distance from ground level exceeds g R (2.5 m). 4.;'.2 Dead £oads: 4.2.2.1 The dead toact~ will consist of an ~arth pressure above ground water level and hydrostatic pressure plus a modified earth pressure below ground water level. The earth pressure above ground water level and the modified earth pressure below ground wa. tot level will be convened [o a horizolltal pressure using RankJne's Theory on active earth pressure. No structure will be deilgncd {'or less than a 30 Ib/ft~ (143~[ Pa) horizontal pce.~ure. 4].'~.2 Foc thc general cm~ when ~ru¢tures are placed in arena where thc soil sur£acc does not slope :he horizontal pre. ute acting at a Doint on the wall o£~he structure above ~round water level will be: where: P =- horizonta[ pressure, lb£/ft: (Pa) K~ - coefficient of active earth pressure = (I - sin ~)/(l + sin ~,) e -- angJe of internal friction of the soil. dee (md), FF = '0rtit weight of soil, Ib/Ra {k~$/m~) and H ; distance from iFound level to the point on the w~. under con$iderat[on, i~ (m). 4.2.2.3 In special cases, when structures ate placed in 3OO 10×26~2004 15:18 OSP ENGINEERING 9 99?230435?0 ~n ~? QO? ~1~ C 857 a.,'ea~ where the ~dil st ~=ac.e ~s sinpln~, the h~on~ ~ at · ~t on ~e ~ a~vc ~d ~ bo~on~ p~u~. Ibt'/~· (PaL · e ~o~oo~ p~ at pound ~r co~C ~om ~ouad waler level to 4,2,2.4 ~e ho~on~ pr~ ~t ~ de~lop ~low plm ho~oa~ pr~e ~g ~m ~e wei~t of w~ oeec ~e below ~ound ~ter le~l P~ ~ hy~o~c pr~ure, Ibf/fl] (~), W~ = u~t wei~t of water, Ib/~3 (~mS), ~ under co~demfion, ~ ~e ho~on~ pr~ure a~ng at · ~int ~aure ~low ~ouud water Ievei ~ulfint f~m ~e wei~t ofsubme~ed ~fl ~: -- ho~ou~ pre~ ~rom submerg~ ~. lbf/fl (Pa3 W~ - W. - u~: wei~t of~ 1~ ~c u~t wei~t of water, lb/fl~ = COc~cicn/of active e~h pr~ure = (1 - dn = a~gle of internal fi'ietion of the sod, deg (~t). and - distance from ~tou~d. water level ~o file point on file wall uuder consic~emtion, fi (m). No~ ~T~e ~*{T',ci~nt of active ~ p~'~*~ ~ ~,gd for t~¢ 4.9 ~,~e.' 4.3, I Live Load,--The llve loads transmitted to the base comi.~ of the maximum value possible of live loach that can be imposed on the roof. Th~ hl¢lud~s the total number of wheel loads that can sim~lUmeously be placed on the 4,3.2 DeadLe~ts--The de~d loads on file base consist of the d~d Ic~ls impo*ed on ~e roof plu~ the weight of the structure excluding the bo.se, or the hydrostatic pr~u.re ~dng on the base, whichever z~ I~eater 4.4 ,4cee~oge$ Loading: 4.4. I Cable Pulling Device$~ble puRi~g devines in ~ll m-ucture~ are d~$ued for the working loads ~[i~ by the ~qfie user. Thc~e worldug loads can be compensated for in the de6gn of the structure and are considered, in =ddleion to the des/go loads. 4.4.2 Lifting Dev[ee.~--I. igiag device~ in ali structur~ de~n~ for a load equivalem to three fime~ the weight of file structure, uffi~ng no more rh~. three lifting p~inu. The loads imlmsed at the [Lvting point~ are considered in the de~ign of the ra-ac'&tre, 4.4,3 LVqui;vment Mounang Devices--The structure [.5 de- implied on file mounting de'ace, as requ~d by These loads ~e considered in the design of fl~e structure_ $. Significance ~d Use $,1 TI~ practice is intendecl ~o ~tandarc~lze thc minimum structural design loading foe underground prec~st concrete utility ~.ructure~, 5.2 Thc user shalI vedff'y the anticipated field and requlr~meu~ with design loads ~eater than those specified ia this Standard. 6. Kerwords 6.1 minimum structural design criteria; peecasr concrete; 301 10/26/2004 1]:18 OSP ENGINEERING a 99?2]04]5?0 ~N ~27 ~08 302 ENGINEERING e 99?230435?0 TORSION HINGED STEEL SECTION - SIDE WALL 4'-O"x6'-6'x48" APPROXIMATE WEIGHTS , PI II I I~lftV ....... ~ CONDUIT ENTRY 4'-0"x6'-6"x48" MINIMUM EXCAVATION PULL BOX .t [~0~ 13:18 OSP ENGINEERING I Hinged..H-20 Cover Weight - ~-70 Lbs. Item# - 7205750 SBC LOGO PLATE r ,,~,~. ~' 1 PID# 70~ 076796 [~ Oldcastle Precas~ SBC-3X5 COVER 3'~" x 5'-0" x 3 1/2" ,~ ~: ~o~,,~ac-~x5 ~oo.~wc SBC HINGED H-20 COVER Phone: 817,453.1054 FOX: 817,~,~07,.,, ~,oldcastlepre~st,com Copyright ~ 20D~,~ 10.'26/2004 13:18 aSP ENGINEERING + 99?250455?0 k~n ~27 ~10 8 ~ SPECIFICATIONS: Strength of r ~ 2. S[eel Reinforcement: ASTM A-615, Grade 60, J ~ ~- '" 3, Loading: Designed for m ~ -- , Knockout H20 Loading, , ~ ,, ~r Cable Rock ~ 35~ Access Opening PLAN VIEW ~ 36"~ Access Opening F Knockout " ~ ~ " J Eac~ End) ~ J ' Each End) Inse~ [Typical) Pulling Ir ump Brass Grounding (Typical) ~ wi(h Cover (Typicot o¢ ~ Each Side) SECTION A-A SECTION B-B ~ OIdcastl~ Precas¢ VERIZON466 41-0'' x 6'-6" x 6'~" I.D. .~ ~..~ :~U~ER~ZON-486_B,d~g VERIZON Splice Box 10/26/2094 15:18 OSP ENGINEERING a 99?239455?9 Mn I  ' r"'---S" (Typ) .i! 3'-3" ,i'~.,.._5,, (--7/>> ITEM I.D. #-18001~ t~ I VERiZON-466 4'-0" x 6'-6" x 6'-6" I.D. OldeasUe Prec~¢ ~ "*~C: 250U~RIZON-~65_r.d~g VERIZON Splice Box ~u[ ~: Janua~, 2005 Phone; 817.~3.1054 Fo~: B17.4~.4007 ~.oldcastle~reca~t. com Co/>yright ~ 2002 10/26/2004 OSP ENGINEERING a 99?250435?0 02'7 IIFJ INTERIOR PLAN SECTION - SIDE WALL 6'-O"xS'-O"x48" APPROXIMATE WEIGHTS PULL BOX ~c,~CT,C,, ,~L~ [212