Loading...
WA0002-CS041028~DALLASCOUNTY PUBLIC WORKS ~q ^ oo -02- FACSIMILE XC: ~ ~,~-,; ~.~-. W/:~FAX XC: W/: ~ F~ NO.: ,, TOTAL PAGES (Including Cover Sheet):~ C0~~ON: Yea ~ Please call 214-653.7151 if there are any difficulties or problems in the ~'ansmission of this fax. IfPs ~ceived in error, please discard it in its entirety. FROM: _ -- ABEL V,'SA'LDAI~A, P,E., PROJECT M~ 411 ELM STREET, 4TM FLOOR DALLAS, TEXAS 75202 TELE. NO.: 214-653-6240 FAX NO.: 214-653-6445 EMA1L: ASaldana~dallas¢ounty.or$ October 28, 200~ Jay Louy, Principal North Texas Contracting, Lac, P.O. Box 468 Keller, TX 76244 Attention: Veto Fran~in, PrOject Manager Re: CDBG FY 2002 Coppell Fire Hydrants & Water Mains Project Golden Triangle Mobile Home Park Construction Contract - Reduced Flowable Backfill Costs Dea~ IVlr, Louy, We appreciate your reply dated October 12, 2004 by Veto Franklin, Project Manager, (attached) providing the Flowable Backfill Raw Material Cost of $46,00/c.y, for thc referenced project. As previously noted, thc following is a summary of the concrete strength reports for Water Line Sta, ~ Break 5+80 August 2, 2004 IS-Day 2+50 August 3, 2004 14-Day 2+00 August 4, 2004 7-Day 1+08 August 4, 2004 i3-Day 274 psi August 30, 2004 279 psi 245 psi August 31, 2004 270 psi lO0 psi September 1, 2004 lg5 psi 942 psi September 1, 2004 1,139 psi Note that three (3) out of four (4) locations, or 75%, of the flowable backfill failed meeting the requi:~l minimum 28-day compressive strength of 500 psi. Also, the compressive strength average is 245 psi, or about S0% of the minimum. Accordingly, Dallas County Public Works has adjusted the Total Unit Price for Bid Item No. I-7, Flowable Backfill as follows: Total Unit Price - Raw Material Cost + Adjusted Raw Material Cost - $80,00/c, Y. $46.001c.y. $28.75'/c.y, ~ Price * 75% x 50% x $46.00/c.y, + 25% x 100% x $46.00 c.y. = $28.7~ Please review this reduced flowable backfill cost at your earliest convenience and respond in writing aa to your approval of same. We look forward to a proper resolution of this outstanding item for the CDIiC; FY 2002 Coppell Fire Hydrants & Water Mains project and its successful completion. Sincerely, Abel V, Saldafla, P.~ Project Manager 411 Elm Street, 4u~ Floor Dallas, Texas 75202 214-653-7151 Fax 214-653.64~5 Mr. Louy October 28, 2004 Page Two At~chm~n~ Donald R. l, iolzwarth. P.E., Director, Dali,., CDuniy Public Work~ Aiber~ BZ~ir Robinson. P.E., A~illanl Director. D~llu Cou~ ~b~c Wor~, Engineering & Cons~c~on Div, ~ck L~ss~rB, D~mr, D~IIa~ Coun~ Planning & ~velopment ~ ~nl~z, ~or Cons~tion ]ns~tor, DalI~ Coun~ ~blic Wor~ ~n~ G~n, P.E., D~ec~r, ~n~inea~n~ ~d ~bllc Wot~, City of Cop~ll Da~ ~je~, Senior V.P., O~rntions Se~ices ~ SWAT D~r, ~o~ble Residen~ Co.unities ~xl file: Col~e~eHs&W..~rMtl~'~qoT~Conencfl~g Reducedl=low~bBa~k/~C01t [02B2004 214 65~ 6445 October 12, 2004 Dali,- County Public Works 411 Elm $~'eet, 4~h Floor Daila~, TX 75202 P.04 TEXAS CONTRACTING, INC. NORTH Attention: Abel Saldana, P.E. Reference: CDBG FY 2002 Coppcll Fire Hydrants & Water Mains Project Dear Mr. Saldana: Wc have received your request for the price of thc Flowable till installed on this project. Our price to Nelson Bros. Ready Mix is $46.00 per cubic yard. In addition, our records show that 238 cubic yards of Flowabla fill was installed on the project. The delivery tickets we have received with the invoices, indicate this amount. Nelson Bros, is providing u~ with the missing batch tickets to verify that this was the amount of FIowable fill delivered to &c project rather than the 193 cubic yards shown on the batch tickets we now have in our files, Please let us know if you need any further information so we can get this matter settled, Sincerely, North Texas ConLracti~g, Veto Franklin Project Manager 4909 Keller Hasler Roi, Keller, TX 76248 · RO, Box 468 Keller, TX 78244 · (817) 430-9500 · Fax (817) 430-0207