Vista Point II-CS041027COPPELL October 27, 2004 B. David Littleton, P.E. ttalffAssociates 8616 Northwest Plaza Drive Dallas TX 75225 RE: Vista Point 11 Construction Development Plan comments Dear Mr. Littleton: The City of Coppell has reviewed your second submittal for the referenced development and has the following comments to offer: 1. The drainage plans have been modified to reflect HPDE pipe rather than RCP pipe. While this is acceptable on the private side, any storm drainage in the public ROW, utility or drainage easements needs to be RCP. Concerning the HDPE pipe on Line section B, there is less than two feet of cover over the top of that pipe. Ensure the pipe is well-bedded or consider the use of RCP for that section. 3. You have indicated on the Utility Plan that the connection to the existing sanitary sewer on the south side of Forest Hill Dr. will be done by dry bore. That is a requirement for our public streets. 4. There are several places where water meters are indicated to be on the private side of the FD vault. All water meters are to be located within the public ROW on the public side of the water main. These comments constitute the City's review of the project, however, we still written approval from TxDOT for connection to their drainage system. We also need a copy of the permit issued by TxDOT for the deccleration lane and driveways on SH 121. TxDOT and/or the City of Coppell will need to review your traffic control plan for the construction of the decel lane and drive approaches adjacent to SH 121. Once these items are accomplished, a permit can be issued, at which point you will need to provide our office with three sets of final plans, provide two half-sized sets for TxDOT and the number of sets your contractors will need onsite for the City's stamp. A Construction Development Permit application (attached) must be filled out and submitted with a check for Construction Inspection fees. A spreadsheet is provided for your convenience in calculating the fees, and copies of the contracts should be provided for verification of the amount. A pre-construction conference will be scheduled with the assigned inspector when the permit and inspection fees are received. If you have any questions or need any further infom~ation, please contact me at the number below. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office Phone: (972) 304-7044 Fax: (972) 304-3570