Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SS9901-LR041004
Construction Materials Testing and Environmental Consulting Texas CM% IBC. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 4, 2004 Date Concrete Placed: September 3, 2004 Client: City of Coppell Project: DeForest Lift Station, Coppell Contractor: $. J. Louis Construction Concrete Supplier and Plant: LMC #7 Location of Placement: Pipe Line Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 10 Project No.: 204-0125 MATERIALS sour~ sso BatchWt, OBSERVATION DATA Description (LDs/CuYd) Mix Number: 1701 Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 85°F Fine Aggregate: Concrete Range: 85°F Slump Range (inches): 2V:" Admixtures: Weather Conditions: Clear 1 Time Started: 02:00 pm 2 Time Completed: 07:00 pm Added Water: 0 gallons Sample Air Content (%): 4.5% Total Cubic Yards Placed: 9 04:39 pm 05:20 pm Intersection of MacArthur & Condor 1076/7144302 Requk :d Strenisth (Lbs./sq.in 4,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in) (Da},s} Tested (Lbs ~ (Lbs/Sq In ) DLS 37 7 09/10/04 118,940 4,210 DLS 38 28 10/01/04 154,820 5,480 DLS 40 I H HOLD Remarks and/or Distribution: cc: Mr Rick O'Dell - City of Coppell Mr. Ted B. Sugg - Turner Collie & Braden~ Inc Mr. Sam Montoya - S.J. Louis Construction of Texas LTD. (Retests-densities) Texas CMT, Inc. Reviewed by: