Loading...
SS9901-LR040930Construction Materials Testing and Environmental Consulting rex;ts CMT, · 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: September 30, 2004 Date Concrete Placed: September 3, 2004 Client: City of Coppell Project: DeForest Lift Station, Coppell Contractor: S.J. Louis Construction Concrete Supplier and Plant: LMC #6 Location of Placement: Manhole Base Standard 6"x 12" Area 28.27 Square Inches Concrete Report No.: 9 Project No.: 204-0125 MATERIALS Sour¢~ SSD Batch Wts OBSERVATION DATA Description (LbffCuYd) Mix Number: 1701 Time Sample Batched: 02:15 pm Cement: Time Sampled: 03:35 pm Sample Location: Station 26+40 FI3.' Ash: TrucWTicket No: 821/6232615 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 93°F Fine Aggregate: Concrete Range: 94°F Slump Range (inches): 1½" Admixtures: Weather Conditions: Clear I Time Started: 02:00 pm 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): 3% Total Cubic Yards Placed: 10 Requit t Stren[gth (Lbs./sq.in 4,000 Specimen Me~ured Age Date Total Load Compressive Strengih Reread'ks Number Slump (in ~ {Days/ Tested (Lbs } (Lbs/Sq In / DLS 34 7 09/09/04 122,520 4,330 DLS 33 IV:" 28 09/30/04 147,060 5,200 DLS 36 28 09/30/04 152,060 5,380 DLS 35 H HOLD Test Methods Utilized Fracture Regular ASTM C-3hC-39,C-143 /Unless Noted Otherwise) Cylinders Made By: EA Remarks and/or Distribution: cc: Mr. Rick O'Dell - City of Coppell Mr Ted B. Sugg - Turner Collie & Braden, Inc. Mr. Sam Montoya - SJ Louis Construction of Texas LTD. (Retests-densities) Texas CMT, Inc. Reviewed