Loading...
SS9901-LR040902Construction Materials Testing and Environmental Consulting Texas CM% Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352.6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: September 2, 2004 Date Concrete Placed: August 26, 2004 Client: City of Coppell ['r~,j¢c:: DeForest Lift Station, Coppeil Contractor: SYB Construction Concrete Supplier and Plant: LMC #3 Location of Placement: Manhole Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 7 Project No,: 204-0125 MATERIALS so~,~ ssD ~.,eh Wis OBSERVATION DATA Description (Lb~/CuYd) Mix Number: 1701 Time Sample Batched: 01:35 pm Cement: Time Sampled: 02:l0 pm Fly Ash: Sample Location: 156' S. & 42' W. of MacArthur/River Chase intersection Coarse Aggregate: Truck/Ticket No: i046/3182542 Intermediate Aggregate: Temperature: Fine Aggregate: Ambient Range: 95°F Concrete Range: 94°F Admixtures: Slump Range (inches): 2/4" I Water reducer Weather Conditions: Clear 2 Air entrained Time Started: 01:00 pm Added Water: 0 gallons Time Completed: 03:15 pm Sample Air Content (%): 2.5% Total Cubic Yards Placed: 4 Required Stren[~th (Lbs./sq.in 4,000 Specimen M~asured Age Da~e Total Load Compressive Strength Remarks Number Slump/in ) {DaysI Testexl tUb, ) {Lbs/SS In ) DLS 25 7 09/02/04 117,180 4,150 DLS 26 28 09;23/04 2¼" DLS 27 28. 09/23/04 DLS 28 H HOLD Test Methods Utilized Fracture Regular AS/M C-31,C-39,C-143 (Unlesst4o~d ot~er~t Cylinders Made By: AA Remarks and/or Distribution: Mr. Rick O'Dell - City of Coppell Mr Ted B. Sugg - Turner Collie & Braden, Inc. Mr. Sam Montoya - S.J. Louis Construction of Texas LTD. (Retests4ensities) Reviewed Construction Materials Testing and Environmental Consulting Texas CM% Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Repor~ Date: September 2, 2004 Date Concrete Placed: August 5, 2004 Client: City of Coppell piqi~c;: DeForest Lift Station, Coppell Contractor: SYB Construction Concrete Supplier and Plant: LMC #6 Location of Placement: Manhole base Standard 6"x 12" Area 28.27 Square Inches Concrete Report No.: 3 Project No.: 204-0125 MATERIALS so~ SSD B.,¢h w,, OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 90°F Fine Aggregate: Concrete Range: 95°F Slump Range (inches): 5 V.," Admixtures: Weather Conditions: Clear I Time Star,ed: 10:30 am 2 Time Completed: 01:15 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 10 10:56 am Lane A & D, Station 46+25 939/6229863 Required Stren[~h {Lbs./sq.in 4,000 Number Slum[} lin~ {Da~s~ Te~ted {Lbs ~ {Lbs/Sq In I DLS 9 7 08/12/04 123,220 4,360 DLSI0 28 09/02/04 131,800 4,660 DLSDLSll112 5~7' 28 H 09/02/04I HOLD 129,860 4,590 ASTM(-31,C-39,C-143 (UnlessNotedOther~seI Cylinders Made By: AS Remarks and/or Distribution: CC: Mr. Rick O'Dell - City of Coppell Mr ]'ed B Sugg - Turner Collie & Braden, Inc Mr. Sam Montoya - S.J Louis Construction of Texas LTD. (Retests~lensifies) Reviewed by: