Loading...
SS9901-LR040712Construction Materials Testing and Environmental Consulting Texas CMT, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Densit), Report No. 3 (204-0125) Method: ASTM D2922 D3017 D698 Pa[~e of 1 Client: City of Coppell Material Description Maximum Optimum Dry Moisture Density Content Project: DeForest Lift Station - Coppell (Lbs/CuF0 Percent 1. Light Gray Clay w/occasional calcareous nodules 102.4 20.4 Test Date: July 16, 2004 2. Tan Sandy Clay 106.9 18.6 3. Gray Sandy Clay w/limestone fragments 106.6 17.7 Report Date: July 12, 2004 4. 3~8,, Crush Stone 104.8 3.9 5. Dark Brown Clay 88.5 28.9 6. Light Brown Sandy Clay 103.4 19.7 Required Density (%): Min. 95%-100% Required Moisture (%): Opt. +3%-Sand; Opt. +4%-Clay; Opt. ±2%-Lime Treated; Opt. +5 under paving Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No Dry Density Moisture Compaction Test (Lbs/CuFf) Content (%) No Probe Depth 2 South of MacArthur Park 11 Station 39+50 107.5 18.8 100.5 2 South of MacArthur Park 12 Station 38+50 104.5 20.1 97.7 6 South of MacArthur Park 13 Station 41 +50 102.4 22.0 99.0 6 South of MacArthur Park 14 Station 42+50 98.6 22.6 95.3 6 South of MacArthur Park 15 Station 43+50 106.7 21.0 103.1 Test results meet project specifications cc: Mr Rick O'Dell- City of Coppell Mr Ted B Sugg - Turner Collie & Braden, Inc. Mr Sam Montoya - S.J. Louis Construction of Texas LTD. (Retests-densities) Construction Materials Testing and Environmental Consulting Texas CM% Inc, 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Densit~ Report No. 1 (204-0125) Method: ASTM D2922 D3017 D698 Pa~e of 1 Client: City of Coppell Material Description Maximum Optimum D~ Moisture Density Content Project: DeForest Lift Station - Coppell (lbs/tuFt) Percent 1. Light Gray Clay w/occasional calcareous nodules 102,4 20.4 Test Date: July 6, 2004 2. Tan Sandy Clay 106.9 18.6 3. Gray Sandy Clay w/limestone fragments 106.6 17.7 Report Date: July 12, 2004 d. 3/8" Crush Stone 104.8 3.9 Required Density (%): Min. 95%-100% Required Moisture (%): Opt. ±3%-Sand; Opt. +4%-Clay; Opt. ±2%-Lime Treated; Opt. +5 under paving Mat Location/Elevation (and/or) Li~ In-Place In-Place Percent No Dry Density Moisture Compaction Test No. (Lbs/CuFf) Content (%) Depth 1 Final - MacArthur median island 1 Station 3+00 101.3 20.4 98.9 2 Final - MacArthur median island 2 Station 2+60 102.0 17.5 95.4 2 Final - MacArthur median island 3 Station 2+00 102.5 18.9 95.9 I Station 2+00 - 3' below grade 4 87.4 32.6 * 85.3 * 1 Station 2+00 - 3 ½' below grade 5 99.2 20.9 96.9 4 Final - west of sanitary sewer manhole 6 Station 0+62 103.5 5.1 98.8 4 North of sanitary sewer manhole 7 Station 0+62 99.6 3.8 95.0 * Test results do not meet project specific~t~ns / cc: Mr. Rick O'Deg - City of Coppell ~ ./In Mr. Ted B. Sugg - Turner Collie & Braden, Inc. r. Sam Montoya- S.J. Lores Conslruc mn of Texas LTD. (Retests-dens~t~es) ~.~ · (~ Construction Materials Testing and Environmental Consulting Texas CMT, Inc 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 2 (204-0125) Method: ASTM D2922 D3017 D698 Pa~e 1 of I Client: City of Coppell Material Description Maximum Optimum D~ Moisture Density Content Project: DeForest Lift Station - Coppell (Lbs/CuFt) Percent 1, Light Gray Clay w/occasional calcareous nodules 102.4 20.4 Test Date: July 9, 2004 2. Tan Sandy Clay 106.9 18.6 3. Gray Sandy Clay w/limestone fragments 106.6 17.7 Report Date: July 12, 2004 4. 3/8" Crush Stone 104.8 3.9 Required Density (%): Min. 95%-100% Required Moisture (%): Opt. :t:3%-Sand; Opt. +4%-Clay; Opt. ±2%-Lime Treated; Opt. +5 under paving Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Densit3, Moisture Compaction Test (Lbs/CuFt) Content (%) No Probe Depth 4 Gravel bedding - south side of entrance 8 3' E. of manhole 102.5 4.0 97.8 4 Gravel bedding 9 Center of entrance 102.0 3.9 97.3 2 Retest # 4 10 (Reported to City of Coppell; Billed to S. J. Louis) 104.8 19.1 98.0 Test results meet project specifications cc: Mr. RickO'DelI-CityofCoppell Mr. Ted B Sugg - Turner Collie & Braden, Inc. Mr. Sam Montoya - S.J. Louis Construction of Texas LTD. (Retests-densities)