Loading...
Freeport NIP(8.0)-CS041101T H £ C I T Y 0 F CO??ELL November 1, 2004 Greg Burk, Superintendent Duke Construction 5495 Belt Line Rd., Suite 360 Dallas TX 75254 RE: Freeport XI & XII Dear Mr. Burk: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, October 30, 2004. The overtime rate including salary and benefits is $40.00 per hour. Six hours were charged to your company on that date. Please send a copy of this letter along with your check for $240.00, payable to the City of Coppell to the following address: City of Coppell Finance Department Attn: Jennifer Armstrong, Finance Director P.O. Box 9478 Coppell, TX 75019 If you have any questions, please contact me at (972) 304-3679. Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 CC: Teri Brown, Finance Department Rhonda Brothers, Engineering Secretary 255 pAb1K%%Ay ,iz p O [3OX 9478 Jr COPPELL 7;~ 75019 il- TEL 972,462 F) 022 ,I- FAX 972,3oz* 3623 OGt 28 04 OB:O?a Gre~ Bork B?P-3B3-3877 p. ! Fax FREEPORT XI-XII 615 FREEPORT PARKWAY COPPELL, TX 75019 Date: 27Oct 04 Number of Pages Attached (including cover) 2 To: ~ar~e Larry Davis r~ Engineering Department corr~y City of Copp, ell Phone: 972.304.3684 Fax: 972.304.3570 From: ~a~ GREGBURK Phone: 214.878.3254 Fax: 972.393.3277 Message: Mr. Davis, Attached is a letter to inform you we plan to be working Saturday, October 301 2004 on the Freeport XI- XII project at 615 Freeport Parkway. A concrete paving pour is scheduled including an approach to Freeport Parkway. Greg Burk Superintendent Duke Construction