Loading...
WA0101-CS040831BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 JOHN W. BIRKHOFF, P E RONALD V CONWAY, PE. GARY C HENDRICKS, PE JOE R CARTER, P.E PAUl. A. CARLINE, P.E MATT HICKEY, PE. DOUGLAS K. SHOWERS, PE Dallas, Texas 75231 Fax (214) 361-0204 Phone (214) 361-7900 August 31, 2004 Mr. Kenneth M. Griffin, P.E. Director of Engineering / Public Works City of Coppell P.O. Box 9478 Coppell, Texas 75019 Re: S.H. 121 Water Line Project, WA 01-01 Resolution of Invoicing Dear Mr. Griffin: We are in receipt of your letter dated April 14, 2004 outlining questions about the invoicing on the referenced project. Gary Hendricks and I have prepared a response, below, and a revised invoice reflecting work up to the end of December 2003 (currently shown on paid invoice #1119). Once this is resolved we are interested in completing the project and issuing construction documents for bidding purposes. 1. Design Services: The most current paid invoice (# 1119, dated January 21, 2004) reflects the project as 95% complete. Although significant additional design work was completed and invoiced as re-design, we now realize that this re-design was attributable to incomplete DIGTESS field locations and therefore misleading utility information. We take responsibility for this and will reallocate these charges, totaling $5,759.94, from re-design to basic services. 2. Design Surveys: The design survey services were originally subcontracted and we erred in invoicing our cost rather than the agreed upon fee for these services. This was corrected in a revised invoice sent October 28, 2002. Then in March of 2004 we invoiced additional dollars for surveying associated with utility locations that were not documented in the original survey. We will bear the cost for this survey work under basic services. The revised invoice (attached) reflects the removal of any additional survey charges and identifies this task as 100% complete. 3. Field Notes and Plats: To date we have prepared four separate plats and field note descriptions for the project. The reason for the significant expense in this item is discrepancies in the deeds for the FRWM properties on the north side of S.H. 121. There are severe inconsistencies and irregularities in the owner transfers and corresponding field note descriptions for the FRWM properties. We expended a significant amount of additional unanticipated effort to resolve the boundary descriptions. We plan to include the full budget amount authorized in the contract in a future invoice. 4. Reproduction: Printing services that were invoiced previously under Reproduction should have been included in basic services. These dollars ($290.21) have been reallocated to Design Basic Services. Mr. Kenneth Griffin, P.E. City of Coppell Page 2 of 2 5. Redesign: As stated earlier in the Design Services subsection of this letter, we now understand that re-design was predicated on the fact DIGTESS did not properly locate the existing utilities along the proposed alignment. We believe that a "constructible" project has been designed based on the more complete utility locations. We realize that these redesign activities were not the responsibility of the City of Coppell and that the effort should have been allocated to basic services. The current invoice reflects a deduction for all costs associated with redesign. The attached revised invoice for work up to the end of December 2003 reflects a total credit to the project of $ 6,050.15. We will track this amount as a pre-payment as we complete the construction documents and proceed to the bidding and construction phases. We recognize that you and your staff have been inconvenienced as you reviewed our previous invoices. We trust that this suggested resolution of the costs for Professional Services will be acceptable and will put us on track to complete the design and proceed to Bidding and Construction in a timely manner. Since there will likely be questions regarding the attached invoice, I will contact you later this week to set up a time to visit with you and go over in detail the resolution of any outstanding items. ncerely, Enclosure