Loading...
St Andrews Est-LR041025ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Do#os, Texo~ 7,5229 972/620-8~11 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: PROJECT: ST. ANDREWS LAND COMPANY CARROLLTON, TEXAS ST. ANDREWS ESTATES ~ COPPELL, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 10/25/04 OUR REPORT NO.: 04219-43 TEST DATA: TEST ~ ELEV. SOIL ID O~T~4~ MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 679 10/25/04 FG-2.0 3 24.0 95.5 24.4 93 f 97 1-A 680 10/25/04 FG-I.0 3 24.0 95.5 24.6 92 97 1-A 681 10/25/04 FG-2.0 3 24.0 95.5 24.7 91 95 1-A 682 10/25/04 FG-I.0 1 28.5 90.5 28.6 89 99 1-A 683 10/25/04 FG-2.0 1 28.5 90.5 28.9 88 98 1-A 684 10/25/04 FG-I.0 1 28.5 90.5 28.5 89 ~ 98 1-A 685 10/25/04 FG-2.0 1 28.5 90.5 29.2 90~ 100 1-A TEST LOCATION: 679 UTILITIES, STORM SEWER LINE C AT STATION 0+30 680 UTILITIES, STORM SEWER LINE C AT STATION 0+30 681 UTILITIES, STORM SEWER LINE C AT STATION 0+90 682 UTILITIES, STORM SEWER LINE C AT STATION 0+90 683 UTILITIES, STORM SEWER LINE C AT STATION 1+30 684 UTILITIES, STORM SEWER LINE C AT STATION 1+30 685 PAVING, STONEWICK LANE NORTH SIDE OF LINE C AT PAVING STATION 4+50 CC: HENNESSEY ENGINEERING; CITY OF COPPELL 1 FILL ' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURALSUBGRADE S. PERCENTCOMPACTIONDOESNOTCOMPLYWITHSPECIFICATIONS j~s~ctf~ed 3. LIME STASILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS tE 4 CEMENTTREATED D. RETEST ROY~/ELEZ Il ALPHA TESTI~, INC. Our test results end ceberls are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with e~q;)ress approval of ALPHA Theuseofournameendtestresu~tsmustreceiveour,,~l'itterlapproval Testresu~tsandm~r~sapp~y~r~yt~thesamp~estestedand/~r~bserved~andaren~tir~dicativeofthequa~itiesof apparen[ly idenbcal or similar specimens Geotechnical Engineering f.~ Construction Materials Testing f~ Environmental Engineering /:h Consulting ALPHA TESTING, INC. 2209 Wisconsin ~t,, Suite 100 ~311~s, Texas 7~5229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: ST. ANDREWS LAND COMPANY CARROLLTON, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 10/25/04 PROJECT: ST. ANDREWS ESTATES COPPELL, TEXAS OUR REPORT NO.: 04219-43A TEST DATA: TEST ~ ELEV. SOIL ID OPTIM*JM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH'~ NUMBER MOISTURE DRY DENSi3~' MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF ~ 686 10/25/04 FG-1.0 1 28.5 90.5 29.2 88 97 I-A 687 10/25/04 FG-2.0 1 28.5 90.5 28.8 88 98 1-A 688 10/25/04 FG-1.0 1 28.5 90.5 29.1 89 i, 98 1-A TEST LOCATION: 686 PAVING, STONEWICK LANE NORTH SIDE OF LINE C AT PAVING STATION 4+50 687 PAVING, STONEWICK LANE NORTH SIDE OF LINE C AT PAVING STATION 4+35 688 PAVING, STONEWlCK LANE NORTH SIDE OF LINE C AT PAVING STATION 4+35 CC: HENNESSEY ENGINEERING; CITY OF COPPELL 1 FILL ° A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D RETEST RO~'~ELEZ ~ ALPHA TESTII~G, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipient s or) file in our officeI and shall not be reproduced and/or distributed except with express approval of ALPHA 'l~ne use of our name and test results mus[ receive our written approval Test results and repotls apply only to the samp es es ed and/or observed, and are not indicative of the qualities of apparently identical or similar specimens Geotechnical Engineerfng /; Construction Materials Testing #' Environmental Engineering ~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 D~llos, Texas 7522~ 972/620-8911 - 972/263-4937 (Metro) FAX: g72(dO~-~023 TESTED FOR: ST. ANDREWS LAND COMPANY CARROLLTON, TEXAS DAILY FIELD REPORT DATE: 10/22/04 PROJECT: ST. ANDREWS ESTATES~-v COPPELL, TEXAS OUR REPORT NO.: 04219-41 TECHNICIAN: M.E. WEATHER: Clear TEMPERATURE RANGE: 80 to 85 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 3 SOIL SAMPLES FOR LABORATORY LIME SERIES ANALYSIS. LOCATIONS AND LABORATORY TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT, ~,T THE COMPLETION OF THE SCHEDULED TESTING, THE =C: HENNESSEY ENGINEERING CITY OF COPPELL IAN RETURNED TO THE DALLAS OFFICE. Respectfully Submitted, ROY VELEZC/ ALPHA TESTING, INC. Geotechnical Engineering /~ Construction Materials Testing ~ Environmental Engineering /~ Consulting