Four Seasons 2R-CS041102 T H E C: I T Y 0 F'
C-OPPELL
November 2, 2004
Charles Hoagland
Hill & Wilkinson
fax 214-299-4437
RE: BCE Specialties
Dear Mr. Hoagland:
A pre-construction conference on the referenced project has been scheduled for
Thursday, November 4, 2004 at 2:00 p..m. in the second floor conference room in Town
Center at 255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present (refer to
Page 2). If you have any questions concerning this project prior to the scheduled
meeting, feel free to contact me at (972) 304-3684.
Larry Davis, Construction Inspecto
Office Phone: 972-304-3684
Fax: 972-304-3570
CCi
Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
See Page 2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner / owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner / owner representative's responsibility to notify the following
parties:
· Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
· Geotechnical firm
· Project Engineer
· Contractors or subcontractors for excavation, utility, & paving operations
· SWPPP representative
0000 MO
~NlqqW3 ×W~'~/£°'BNO±S~BN~03 .g~,00 £~:I~ ~0/I~
B~OW OI NOIi~£S INWISI~ BWII-~'S BWI£ BlOC
'£dBO '~8NB 9q]ddO3 ~0 AII3=OI
~:~ ~00~/~0/~
NO I ±UW I NOD BBUSSBH