Vista Point II-CS041109COPPELL
November 9, 2004
B. David Littleton, P.E.
or Clint Philpott
Haltl'Associates-- ,.,.;~--,7',/ ~
RE: Vista Point II Addition
Dear Sirs:
A pre-construction conference on the referenced project has been scheduled for Friday,
November 12, 2004 at 10:00 a.m. in the second floor conference room in Town Center at
255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincere[¥,
-Larry Davis, Construction Inspector
Office Phone: 972-304-3684
Fax: 972-304-3570
Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
SeePage 2
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner / owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
· Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
· Geotechnical firm
· Project Engineer
· Contractors or subcontractors for excavation, utility, & paving operations
· SWPPP representative