SS9901-AG041012AGENDA REQUESI' FORM COl'FELL DEPT: Engineering/Public Works DATE: October 12, 2004 ITEM #: 13 ITEM CAPTION Consider approval of awarding Bid ('ontract #Q-0804-01 to Canfer Construction Company, for the construction of the Deforest Road and Sandy Lake Road Lift Station Improvcnrents in an amount of $2,586,625, as provided for in water and sewer CiP funds: and authorizing the City Manager to sign. GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M ~ Faught - Suhy Vote - 7-0 EXECUTIVE SUMMARY: Approval of this construction contract will allow for the construction of a new lift station at Deforest Rd. and MacArthur Blvd. and for the rehabilitation of the Sandy Lake Rd. Lift Station at MacArthur Blvd. Staff will be available to answer questions at the Council meeting. FINANCIAL COMMENTS: Funds are to be transferred from operations to the Water/Sewer C1P accounts for this contract. Agenda Request Form Revised0904 Document Name: #Lift StationBid-IAR MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To~ From: Date: RE: Mayor and City Council Kenneth M. Griffin, P.E., Director of Engineering/Public Works October 12, 2004 Consider approval of awarding Bid/Contract #Q-0804-01 to Canfer Construction Company for the construction of the Deforest Road and Sandy Lake Road Lift Station Improvements in an amount of $2,586,625, as provided for in water and sewer CIP funds; and authorizing the City Manager to sign. On Thursday, September 2, 2004, the City of Coppell received and opened three bids for the lift station improvements for Deforest Rd. and Sandy Lake Rd.. Two of the bids received were close in price and the third bid was approximately 35% higher than the two lower bids. It is our understanding that the higher bidder, Cajun Constructors, Inc., picked up the plans and specifications shortly before the bid opening and did not have time to make an honest attempt to provide a competitive bid. There is less than 1% separating the two low bids. This project was identified in the City's 1994 Wastewater Collection System Master Plan. The project is broken into two parts. The first part deals with the existing lift station at the northwest comer of Deforest Rd. and MacArthur Blvd. That lilt station was originally a MUD lilt station that the City took over when the City absorbed the MUD in mid-1990. Up until the time that the City took over the lilt station, the maintenance was somewhat questionable. Since that time, there have been substantial improvements made to the lift station, but in fact, it has outlived its life in both capacity and design technology. Through the years, the City has received some odor complaints, especially in the summer, associated with the Deforest Rd. Lift Station. Those complaints have been substantially reduced since the City took over the maintenance of the lift station. Because the current lift station is undersized, this project will construct a completely new lift station immediately east of the existing lift station. To accomplish this, the existing brick wall parallel to MacArthur Blvd. will be removed and rebuilt once the new lift station is constructed. The wall will be closer to MacArthur Blvd. when it is rebuilt. By rebuilding the lift station in its entirety, the City can incorporate newer technology, especially in regard to odor control. Once the new lift station is complete and in service, the old existing lilt station will be demolished and removed from the site. The Sandy Lake Rd. Lift Station will not be rebuilt, it will only be modified. The City is able to modify this lift station because changes are being made to the flow with the force main projects. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Council may recall the City is currently constructing a fome main down MacArthur Blvd., from Sandy Lake Rd. to Deforest Rd., and has recently completed a portion of a new force main from MacArthur Park south to Belt Line Rd. The purpose of these two force mains is to upsize the lines to be in conformance with our master plan and to split the flow that currently go to the Sandy Lake Rd. Lift Station. Today, all sewage that goes into the Deforest Rd. Lift Station is pumped directly to the Sandy Lake Rd. Lift Station and is pumped from the Sandy Lake Rd. Lift Station into the TRA line south of the Riverchase Golf Course. The only sewage flow in the City of Coppell that does not go through the Sandy Lake Rd. Lift Station is the flow that is contained within the Grapevine Creek Sanitary Sewer Line. With the construction of the new force main, the City will be splitting the flow that goes to the Sandy Lake Rd. Lift Station. Once all the lift stations and force main projects are complete, there will be three separate and distinct flows in Coppell to the TRA line: 1) The Grapevine Creek Sanitary Sewer Line; 2) The sewage that flows into the Deforest Rd. Lift Station will be pumped from Deforest Rd. down MacArthur Blvd., bypassing the Sandy Lake Rd. Lift Station and then continuing in the existing force main that connects to TRA south of the Riverchase Golf Course; and 3) The sewage that flows directly into the Sandy Lake Rd. Lift Station will be pumped from the Sandy Lake Rd. Lift Station into the new force main constructed in south MacArthur Blvd. to Belt Line Rd. Because the flow from the Deforest Rd. Lift Station will bypass the Sandy Lake Road Lift Station, we are able to use the existing lift station at Sandy Lake Rd. and modify it by changing out the pumps and doing some additional internal changes. Approval of this contract for the construction and modification of the lift stations, will substantially complete the sanitary sewer projects identified in our master plan. Staffwill be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" TurnerCollie(O'Braden Inc. Engineers o Planners · Project Managers ! 7300 Dallas Parkway Dallas, Texas 75248 Tel: (972) 735 3000 Fax: (972) 735-3001 September 10, 2004 TC&B Project No. 052131124.0001 Mr. Ken Griffin, P.E. City of Coppell P.O. Box 478 Coppell, Texas 75019-4409 Re: City of Coppell Deforest Road Lift Station Improvements DeForest & Sandy Lake Wastewater Lift Stations Project No. SS 99-01 Dear Mr. Griffin: Sealed bids for the above project were received on Thursday, September 2, 2004 at 10:00 am at the Coppell City Hall. Three bids were received as follows: · Can-Fer Construction Company · Red River Construction Company · Cajun Constructors, Inc. $2,586,625 $2,606,655 $3,560,000 The apparent lowest bid was received from Can-Fer Construction Company in the amount of $2,586,625. A tabulation of bids is enclosed. There were no irregularities in the bids. Can-Fer Construction Company provided references for projects similar in size and scope to the DeForest & Sandy Lake Wastewater Lift Stations. We have contacted three references, and they reported that Can-Fer Construction Company had performed well and did not note any problems. Records of these telephone conversations are enclosed. Based on the above, we recommend award of the project to Can-Fer Construction Company in the amount of their base bid, $2,586,625. This recommendation is subject to the City's satisfactory review of Can-Fer Construction Company financial information. If you have questions or require additional information, please call me at 972-735-3056. Sincerely, Erika K. Cooper, P.E. Project Manager Encl. CC: Jarod Anderson - City of Coppell Greg Hooten - TCB Engineering Ext ellence for Over One-Half Century Turner Collie _ Braden Inc. Date of Call: Placed By: Company: Telephone: Received By: Company: Telephone: Subject: Job Number: September 8, 2004 Steven Real Turner Collie & Braden 972-735-7014 Susan Weaver City of Lewisville 972-219-3458 Reference: Can-Fer Construction Company 052131124.0001.0400A 103 TELEPHONE CALL CONFIRMATION Susan Weaver was listed by Can-Fer Construction Company as a reference, sighting the work on both the Eastside Pump Station and the Prairie Creek Pump Station for the City of Lewisville. Ms. Weaver spoke highly of Can-Fer during this phone conversation. Three direct questions were asked of her: How was the project organization during the projects? Can-Fer was a good company to work with; their organization was good for the project. Was the schedule met? Can-Fer remained on budget and had no liquidated damages. She did not recall specifically the dates of project. Comments regarding change orders: Prairie Creek Pump Station was a rehab project, and as with many rehab projects, there were field observations that affected the project. All change orders were because of factors associated with the project and not a result of construction issues. Copy: E. Cooper G. Hooten Turner Collie _ Braden Inc. TELEPHONE CALL CONFIRMATION Date of Call: September 9, 2004 Placed By: Company: Telephone: Steven Real Turner Collie & Braden 972-735-7014 Received By: Company: Telephone: Bryan Jann Turner Collie & Braden (worked with CAN FER while with Alan Plummer & Associates) 703-463-1191 (cell) Subject: Reference: Can-Fer Construction Company Job Number: 052131124.0001.04000A103 Bryan was listed by Can-Fer Construction Company as a reference, sighting the work on the City of Denton Cooper Creek Lift Station. Bryan was the engineer for Alan Plummer & Associates (APA) on this $1,255,259.00 job. This lift station was a new facility constructed adjacent to an existing lift station. Bryan stated that he did move from APA to TCB prior to the completion of this project. Three direct questions were asked of Bryan: How was the project organization during the projects? Can-Fer was an easy company to work with; they where responsive to the engineer. Was the schedule met? When Bryan left APA, Can-Fer was on schedule and to his knowledge they finished on schedule. Comments regarding change orders: Change orders by Can-Fer were owner requested in the aforementioned project. Additional Comments: Stated Can-Fer had a good quality of work and was good to work with. Copy: E. Cooper G. Hooten TurnerCollie _ Braden Inc. Date of Call: Placed By: Company: Telephone: Received By: Company: Telephone: Subject: Job Number: September 10, 2004 Steven Real Turner Collie & Braden 972-735-7014 Chris Harder City of Fort Worth 817-392-6820 Reference: Can-Fer Construction Company 052131124.0001.0400A103 TELEPHONE CALL CONFIRMATION Chris Harder was listed by Can-Fer Construction Company as a reference, sighting the work on both the Sendera Ranch Lift Station for the City of Fort Worth. Mr. Harder spoke highly of Can-Fer in his the message he left in response to my inquiry. He stated that Can-Fer did a good job coordinating with their subcontractors and were very easy to work with. In addition, Mr. Harder stated that he had only good things to say about Can-Fer. Copy: E. Cooper G. Hooten Proposed Sanitary Sewer Lift Stations Deforest Rd. and Sandy Lake Rd. City of Coppell Project SS99-01 Exhibit I COPPELL