Loading...
ST9301-CN041108 I JACOB$ 6688 North Central Expressway Suite 400, MB 13 Dallas, Texas 75206 US A 1214.424.7500 Fax t 214.6963499 November 2, 2004 Mr. Ken Griffin, P.E. Director of Engineering / Public Works City of Coppell 255 Parkway Boulevard P.O. Box 9478 Coppell, TX 75019 Re: Sandy Lake Road Jacobs No. C3X35200 Dear Mr. Griffin: This letter when signed and acknowledged below will serve as an amendment to our contract dated October 8, 2003. The City of Coppelt desires to add an additional median opening at Station 25+63+. Jacobs will revise the plans to reflect the median opening. We anticipate the following additional fee: Project Manager Project Engineer CADD 1 hr. @ $120/hr = $120 2 hrs @ $90/hr = $180 2 hrs @ $73/hr = $146 $446 The total fee for the project will increase from $93,636.00 to $94,082.00. Please indicate concurrence below. Very truly yours, Jacobs Civil, Inc. ~F~,--- 'Marl~G. Go~e, III, P.E. Director of Texas Operations Enclosure Authorize:~~: Jacobs Er~gineerin9 Group inc. J,/4~lt Witt, City Manager Date