WA0002-CS041110COPP-ELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To~
Larry Davis, Construction Inspector
From:
Suzan Taylor, CIP Coordinator
Date:
November 10, 2004
WALK-THRU for Project #WA 00-02
Golden Triangle Mobile Home Park
A final walk-thru for the utility installation (waterline and fire hydrants) on the
referenced project has been scheduled for:
Monday, November 15, 2004 at 9:00 a.m. (meet at the park manager's office)
Please let me know if I can be of further assistance.
ec:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Tim Oates, Fire Marshal
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"