Loading...
WA0002-CS041110COPP-ELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To~ Larry Davis, Construction Inspector From: Suzan Taylor, CIP Coordinator Date: November 10, 2004 WALK-THRU for Project #WA 00-02 Golden Triangle Mobile Home Park A final walk-thru for the utility installation (waterline and fire hydrants) on the referenced project has been scheduled for: Monday, November 15, 2004 at 9:00 a.m. (meet at the park manager's office) Please let me know if I can be of further assistance. ec: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Tim Oates, Fire Marshal "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"