Loading...
SS0201-CS041007 (2)COPPELL October 07, 2004 Luis Velasquez Fox Contracting, Inc. P.O. Box 951 Midlothian, TX 76065 RE: Coppell Rd/Service Center Sewer Main Project, SS #02-01 Final Acceptance Dear Mr. Velasquez: Representatives of the City of Coppell have confirmed a final inspection of utility construction for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Fax: (972) 304-3570 cc: Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Civil Engineer Glenn Hollowell, P.E., Asst. Director of Public Works