SS0201-CS041007 (2)COPPELL
October 07, 2004
Luis Velasquez
Fox Contracting, Inc.
P.O. Box 951
Midlothian, TX 76065
RE:
Coppell Rd/Service Center Sewer Main Project, SS #02-01
Final Acceptance
Dear Mr. Velasquez:
Representatives of the City of Coppell have confirmed a final inspection of utility construction
for the referenced project. The two-year maintenance bonds and as-built drawings have been
received from the contractor. Maturity on the bonds will be two years from the date of this
letter.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that time, you will be contacted to make repairs.
Thanks for your cooperation.
Fax: (972) 304-3570
cc: Griffin, P.E., Director of Engineering & Public Works
Keith Marvin, P.E., Civil Engineer
Glenn Hollowell, P.E., Asst. Director of Public Works