St Andrews Est-CS041104 (2)T H £ C I T Y 0 F
COl'FELL
November 4, 2004
Roy Velez, Project Manager
Alpha Testing, Inc.
2209 Wisconsin St, Suite 100
Dallas TX 75229
RE: St. Andrews Estates Pavement Subgrade
Dear Mr. Velez:
We are in receipt of your proposed lime series for St. Andrews Estates. It would appear
that the 30 lbs. per square yard would be adequate for the areas with a PI above 20. What
do you propose to do in the areas that have a lower PI? Please send your response and
proposal to my attention with copies to those on the distribution list below.
Also, for future reference, a licensed engineer should seal reports of this type.
have any questions, feel free to contact me.
Sincere¢4' ,--
La~y Davis /"'
Con~st~ction Inspector
Off'c~: 972-304-3684
Fax: 972-304-3570
If you
CC:
Bill Jones, LH Lacy Company
Ten'y Holmes, Holmes Builders
Dean Trudell, St Andrews Land Co.
Pete Hennessey, P.E., Hennessey Engineering
Keith Marvin, P.E., Civil Engineer