Freeport NIP(2.8)-CS041116 T H
COPPEEL
8350 No~..~a~l.Expressway, Suite 1000
.e~l'a~ Texas ? 5~,,,x
RE: Freeport North. Lot 3, Block 3 - Dexas
Fee Assessment Letter - Revised
October 4, 2004
Dear Mr. Evans: / '~
It has come to my attention that the or,~ginal fee assessment letter dated December 12, 2003 for the
referenced development did not include one of the 2-inch irrigation meters. I have revised the assessment
and I am transmitting it herewith.
Normally water impact fees are required to be paid prior to being issued a building permit. Since perm/ts
bare already been issued, and the construction is well underway, we will__require that the fees be paid
prior to being given a certificate of occupancy..
The majority of the impact fees have already been paid, and the additional cost of the meters and
inspections has already been collected. The total Difference between this assessment and thc previous
one is $2,508.48. Ofthat amount $2,240 is the amount of the additional impact fee. When the contractor
brought the meter and inspection fee to our public works service center they inadvertently had the check
made out for an extra $50. We accepted that check, and have applied the $50 to the additional impact
fees. This leaves a total of $2,! 90 that needs to be paid for this additional water meter.
Pl~~easemake for the Fees to the City of Coppell in the amount of $2, lg0.OO at the )
payment
Impact
Please feel free to call wilh any questions or comments concerning this issue.
Sincerely,
Keith R. Marvin. P.E.
Civil Engineer
Post-it® Fax Note 7671 /
:o. ,
cc;
Yermifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretaxy, Building Inspections
Glerm Hollowe]l, Aa, igtant Director of Public Workg
Greg Jones, Chief Budding Official