MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To~
From:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Larry Davis, Construction Inspector $rff~f~/f/ff./~
Office Phone: (972) 304-3684 //3{d/dt~2
Fax: (972) 304-3570
Date:
RE:
November 16, 2004
WALK-THRU for Dexas (Freeport North, Lot 3 Block 3)
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for
Monday, November 22, 2004 at 2:00 p.m.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection. Let me know if I can be of further
assistance.