Loading...
ST9302-CS000803August 3, 2000 Mr. Doug Teter, Vice President Ed Bell Construction Company P.O. Box 540787 Dallas, Texas 75354-0787 RE: Sandy Lake Road, ST93-02 Dear Mr. Teter: I am in receipt of your letter dated July 20, 2000. In my opinion you failed to show a cost comparison between the drilled shaft wall as bid, and an alternate which would include a combination of the drilled shaft and gravity wall for panels RW 1 through RW 8. I believe the more accurate comparison based on the information provided on the construction plans and the associated bid items would be as follow: Drilled Shaft Retaining Wall Sta 14+75 to 16+68 Item # Description Unit Unit Price Quantity Cost Measure 66 Drilled Shaft SF $19.00 1575.025 $29,925.48 Wall 67 24" dia Drilled LF $60.00 546 $32,760.00 Shaft TOTAL $62,685.48 255 PARKWAY dr P,O.BOX 47B dr COPPE:!..L TX 75019 dr TEL 972/462 0022 'k'FAX 972/304 3673 Combination Wall Item # Description Unit Unit Price Quantity Cost Measure 66 Drilled Shaft SF $19.00 292.25 $5,552.75 Wall 67 24" alia Drilled LF $60.00 84 $5,040.00 Shaft 66A Gravity Ret. SF $55.00 1085.5 $59,702.50 Wall TOTAL $70,295.25 Considering that the site conditions have not changed since this work was bid and considering that it is not in the City of Coppell's interest to invest more than the $62,685.48 necessary to construct the wall, please direct your subcontractor to build the drilled shaft retaining wall as bid. If you have any questions or comments please call 972/304-3679 at your earliest convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works