Loading...
Coppell Bible 2-CS041119COPPELL November 19, 2004 Mike Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. Two Northpark, 8080 Park Lane, Suite 600 Dallas, TX 75231 RE: Coppell Bible Fellowship Addition, Lot 1 Block A, Phase II Dear Mr. Daniel: The City of Coppell has requested a Sidewalk and Utility Easement, and a Temporary Construction Easement in connection with the Phase I construction of West Sandy Lake Road. Per your request, attached to this letter is the paving plan showing the median opening requested by Coppell Bible Fellowship. At this time the City intends to construction the median opening as shown on the plan. If you have any questions, please contact me. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office Phone: (972) 304-7044 Fax: (972) 304-3570 Attached: Paving Plan & Profile, W Sandy Lake Rd Phase I