Freeport NIP(8.0)-LR041123RoneEngineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76! 18
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
Report No.: 221324
Project No.: 049245
Date of Service: 10/22/2004
Report Date: 11/23/2004
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
MEASURED
STRENGTH:
SLUMI~ (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5" mmximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/22/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 3:45am BATCHTIME: 3:10alTl
TEMPERATInRE (F) - AIR 72 F CONCRETE: 81 F
TRUCK NO: 1827 TICKET NO: 656502
AIR CONTENT (%): NA UNITWEIGItT(pcf): NA
OVERALL PLACEMENT LOCATION:
Panels at P-1 thru P-12 and P-56 to P-62
SAMPLE LOCATION: P-3
REPORT OF TESTS
SLUMP
(inches)
4.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER 1VLa2~M1 IM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 10/29/2004 7 6.00 28.26 132090 4670 Unbonded Cap
1 2 11/19/2004 28 6.00 28.26 161670 5720 Unbonded Cap
1 3 11/19/2004 28 6.00 28.26 167230 5910 Unbonded Cap
Average 5820
1 4 Hold
LI3/fTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject maaer provided by persons or conditions over which we have no con~-ol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fi~ll without the written approval of Rone Engineers, Ltd.
01SS Page 1 of 6
n ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
ServJees:
Report No.: 221324
Project No.: 049245
DateofService: 10/22/2004
Report Date: 11/23/2004
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
except 9 1 2
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/22/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 4245aD1 BATCHTIME: 4:00am
TEMPERATURE (F)-AIR 72 v CONCRETE: 83 F
T~UCK NO: 931 TIC~T NO: 656512
AIR CONTENT (%): NA UNITWEIGHT (pcO: NA
OVERALL PLACEMENT LOCATION:
panels at P-1 thru P-12 and P-56 to P-62
SAMPLE LOCATION: P~6
REPORT OF TESTS
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLLNDER M3XIMIJM COMI~RESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
2 1 10/29/2004 7 6.00 28.26 125880 4450 Unbonded Cap
2 2 11/19/2004 28 6.00 28.26 168690 5970 Unbonded Cap
2 3 11/19/2004 28 6.00 28.26 173950 6150 Unbonded Cap
Average 6060
2 4 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
31SS Page 2 of 6
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport X1 & XII
Coppell, Texas
Services:
Report No.: 221324
Project No.: 049245
Date of Service: 10/22/2004
Report Date: 11/23/2004
Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/22/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 5:45am BATCHTIME: 5:10am
TEMPERATURE (F)-AIR 72 F CONCRETE: 85 F
TRUCKNO: 931 TICKETNO: 656522
AIR CONTENT (%): NA LrNITWEIGHT(pcf): NA
OVERALL PLACEMENT LOCATION:
Panels at P-1 thra P-12 and P-56 to P-62
SAMPLE LOCATION: P~9
REPORT OF TESTS
MEASURED
SLUMP
(inches)
4.5
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
3 1 10/29/2004 7 6.00 28.26 120430 4260 Unbonded Cap
3 2 11/19/2004 28 6.00 28.26 167220 5910 Unbonded Cap
3 3 11/19/2004 28 6.00 28.26 148290 5240 Unbonded Cap
Average 5580
3 4 Hold
Water added at site: 5 gallons
LIMITATIONS: The test results presented hereto were prepared b~sed upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriiten approval of Rone Engineers, Ltd
3ISS Page 3 of 6
neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
Report No.: 221324
Project No.: 049245
Date of Service: 10/22/2004
Report Date: 11/23/2004
Services:
Obtain samples of f~esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLETMp (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLAdNT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTMC-1231
ASTM C-39
except 9 1 2
MIX DESIGN I.D.: 9349
PLACEr, lENT DATE: 10/22/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 6:45am BATCHTIME: 6:03am
TEMPERATURE (F) - AIR 72 g CONCRETE: 83 F
TRUCK NO: 1883 TtCKET NO: 656532
AIR CON"rENT (%): NA UNIT WE1GHT (pcO: NA
OVERALL PLACEMENT LOCATION:
Panels at P-1 thra P-12 and P-56 to P-62
SAMPLE LOCATION: P-12
REPORT OF TESTS
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
4 1 10/29/2004 7 6.00 28.26 117340 4150 Unbonded Cap
4 2 11/19/2004 28 6.00 28.26 158460 5600 Unbonded Cap
4 3 11/19/2004 28 6.00 28.26 146830 5190 Unbonded Cap
Average 5400
4 4 Hold
Water added at site: 10 gallons
LIMiTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wri~en approval of Rone Engineers, Ltd.
)ISS Page 4 of 6
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport X1 & XI1
Coppell, Texas
Services:
Report No.: 221324
Project No.: 049245
Date of Service: 10/22/2004
Report Date: 11/23/2004
Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
S LU31P (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5" maximum
NA
ASTM C- 172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-1231
ASTM C-39
except 9 I 2
MEASURED
MIX DESIGN I.D.: 9349 SLUM~
PLACEMENT DATE: 10/22/2004 (inches)
WEATHER CONDITIONS: Clear 5.25
TIME SAMPLED: 8:00am BATCH TIME: 7: ] 8am
TEMPERATURE (F) - Am 72 F CONCRETE: 83 F
TRUCKNO: 0 TICKET NO: 656542
AIRCONTENT(%): NA UNITWE1GHT(pc0: NA
OVERALL PLACEMENT LOCATION:
Panels al P-I thra P-12 and P-56 to P-62
SAMPLE LOCATION: P-59
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
5 1 10/29/2004 7 6.00 28.26 110940 3920 Unbonded Cap
5 2 11/19/2004 28 6.00 28.26 143000 5060 Unbonded Cap
5 3 11/19/2004 28 6.00 28.26 142430 5040 Unbonded Cap
Average 5050
5 4 Hold
Water added at site: 10 gallons
LLMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or an>, other feature of similar subject mailer provided by persons or conditions over which we have no control Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fidl without the wrillen approval of Rone Engineers, Ltd.
01SS Page 5 of 6
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214l 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XI1
Coppell, Texas
Report No.: 221324
Project No.: 049245
Date of Service: 10/22/2004
Report Date: 11/23/2004
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
MEASURED
STRENGTH:
SLUMP (in):
AIR (%):
TEST I~LETHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
ex~ptgl2
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/22/2004
WEATHER CONDITIONS: Cleat
TIME SAMPLED: 8:45am BATCH TIME: 8:07am
TEMPERATURE (Fl- AIR 75 F CONCRETE: 86 F
TRUC~:NO: 1815 TICKET NO: 656551
A1R CONTENT (%): NA UNITWEIGHT(pcf): NA
OVERALL PLACEMENT LOCATION:
Panels at P-I thru P-12 and P-56 lo P-62
SAMPLE LOCATION: P-62
REPORT OF TESTS
SLUMP
(inches)
5.5
Concrete Compressive Cylinder 6" x 12"
CYLINDER
MARKED DATE
SET NO. TESTED
6 1 10/29/2004
6 2 11/19/2004
6 3 11/19/2004
AGE DIAMETER AREA
(days) (inches) (sq.in.)
7 6.00 28.26
28 6.00 28.26
28 6.00 28.26
MAXIMUM COMPRESSIVE
LOAD STRENGTH
(lbs. force) (psi)
113310 4010
155310 5490
141940 5020
Average 5260
FRACTURE
TYPE
Unbonded Cap
Unbonded Cap
Unbonded Cap
6 4 Hold
Water added at site:
Technician: Scott Mitchell
Report Distribution:
(1) Duke Realty Services, LP
( 1 ) ExtruDer
(1) City of Coppell
(1) CIE,' of Coppell
5 gallons
Started: 2:15am
Finished: 9:30am
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific smnples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of RoDe Engineers, Ltd.
01SS Page 6 of 6