Loading...
Coppell/121 Off Pk-CS041201Keith Marvin - Cg~pell/121 Office Park From: To: Date: Subject: Hello Keith, "Konstantine Bakintas" <kb@bhbinc.com> "Keith Marvin" <kmarvin@ci.coppell.tx.us> 12/1/2004 3:02:12 PM Coppell/121 Office Park We've just been informed that the embankment at the back of 815 Mulranny Drive sloughed off before the contractor was able to complete construction of the retaining wall. The Contractor has coordinated with the home owner (Mr. Kumar Subramaniam), and is working as quickly as possible to complete construction of the proposed screening/retaining wall and reconstruct the adjacent properties fence and wooden wall. Attached, please find a revised wall detail, which extends northward to include the adjacent properties fence and wooden wall. This revised detail also provides for a concrete stem up to the top of the 5' embankment. Please be assured that the Contractor, the Developer and this office are working as quickly as possible to address this issue. Should you have any questions or comments, please feel free to call. Thank you, Konstantine Bakintas, PE BHB Engineering & Surveying Tel (817)338-1277, Fax (817)338-9245 <http://www.bhbinc.com/> www.bhbinc.com, <mailto:kb@bhbinc.com> kb@bhbinc.com CC: "Tom Wouters" <twouters@realtycapital.com>, <michaelwilcher@mac.com>, "Phil Salyer" <salyer@salyerandassociates.com> o~zm