Belt Line Trade-CS040414Project: IDI Belt#ne
Date: 4/14/2004
DEVELOPMENT FEE TABLE
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,180.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $188.48
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $4,157.48
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,240.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $89,437.50 $89,437.50
(100% due prior to Council Approval)
Street Light Fee Information not Available
(I 00% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
FOTAL $101,623.46
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $89,437.50
DEVELOPMENT FEE WORKSHEET
PROJECT: IDI Heltline
DATE: ,t/14/2004
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 2 inch = 8 ESU's
1 - 2 inch = 8 ESU's
0 = 0 ESU's
2 - 8 inch = 2.5 ESU's
Total #: 18.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $188.48
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $188.48
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 2 Fireline Meter(s) @ $1,984.50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: I Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8
(Due prior to issuance of building permit)
@ $280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 .Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ali developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$5,180.00
$2O0.00
$188.48
$188.48
$0.00
$3,969.O0
$3O.OO
$9O.OO
$2,240.00
$5O.OO
$5O.OO
Page1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$89,437.5O
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: IDI Beltline
DATE: 4/14/2004
ROADWAY IMPACT FEE:
Service Area * 6
2ategory ** Industrial
Land Use ** General Light Industrial
3uilding Area (sf) 375,000
Development Units ** 375.00
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) ~ $119,250.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees 25%
Total Credit $29,812.50