Loading...
Coppell Trade-CS041118CASE NO.: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Trade Center P & Z HEARING DATE: C.C. HEARING DATE: November 18, 2004 December 14, 2004 STAFF REP.: Gary L. Sieb, Director of Planning LOCATION: Along the north side of Sandy Lake Road, between Northpoint Drive and the extension of Freeport Parkway. SIZE OF AREA: 40.6 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Approval of a Concept Plan allowing the construction of approximately 645,000-square feet of office/warehouse uses on 40.6 acres of land and approval of a Detail Plan on 12.87 acres of Phase 1 development, containing a 195,845 square-foot building. APPLICANT: Coppell Sandy Lake Industrial LP or assigns A1 Sorrells, The Holt Companies 5055 Keller Springs Road Suite 300 Addison, Texas, 75001 (972) 280-8355 Fax: (972) 241-7955 HISTORY: Page 1 of 4 There has been no recent development history on the subject tract. Item #7 TRANSPORTATION: Sandy Lake Road is shown as a C4D/6, four-lane divided roadway in a l l0-foot right-of-way with construction to begin in early 2005. SURROUNDING LAND USE & ZONING: North - vacant; LI (Light Industrial) South - vacant; PD-194-LI (Planned Development for industrial uses) East - vacant; LI (Light Industrial) West - vacant: LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for light industrial and showroom uses. DISCUSSION: Page 2 of 4 This is a proposed 40-acre warehousing project which will eventually house approximately 645,000-square feet of floor space in four buildings. As currently presented, this development will occur in three phases. Phase One is a detailed plan, Phases Two and Three are conceptual at the present time, hence, the request for both Concept approval and Detail Plan approval. The Concept Plan is in conformance with the Comprehensive Master Plan and, as stated above, is a three-phase development. Phase Two outlines two buildings with a total square footage of 300,000 feet being built in the northwest quadrant of the site. Phase Three shows one additional building of roughly 150,000-square feet being constructed just west of the Detail Plan submitted here. Phase One Detail Plan proposes a 195,800-square-foot warehouse being built on approximately 13 acres of ground at the eastern end of this parcel. Issues to be dealt with include drainage and tree mitigation. Open drainage is proposed to traverse the site, and we can support that concept here as we have done elsewhere in the industrial sections of Coppell. Tree mitigation is substantial on this site because the parcel is covered with trees. Taking into consideration the recently passed ordinance eliminating from retribution the calculation of the number of trees under the building, a substantial mitigation to the tune of $500,000 still exists. Item//7 If mitigation were to be figured only on the Phase One development, this figure would be substantially lower. However, because drainage issues must be dealt with at the outset of the project (and the vast majority of trees are in the proposed drainage channel; read: remove all trees), Phase One development must absorb this cost. We can support spreading the cost over a number of years, and one of our conditions statements addresses this issue with an arbitrarily suggested specific time period in which to pay this fee. Our Economic Development Committee is also working with this applicant exploring ways the mitigation figure might be reduced. If the Committee develops a more attractive retribution resolution, we would support their recommendation. The applicant is anxious to begin construction of this project, hut a complicating factor is the fact that the Committee cannot consider this issue until its December 1 meeting. That date is two weeks after our Planning Commission meeting, and not knowing their final recommendation, the only position we can take is the fee payback option as expressed in the staff recommendation. We have purposefully written the mitigation condition subject to the EDC's findings. RECOMMENDATION TO THE PLANN1NG AND ZONING COMMISSION: Staff recommends APPROVAL of this request subject to the following conditions: 1. Change address of Sandy Lake Industrial to "Addison" from "Dallas" on all exhibits. 2. Tree mitigation fees of $500,000 shall be spread over five years with equal amounts ($100,000/year) being paid annually (January lst). If, however, the Economic Development Committee can determine a more equitable fee arrangement, we would support their findings. 3. Do not include exhibits PD L0.01, .02, L1.01 in future submittals. 4. Provide REVISED exhibit L0.00 with mitigation changes (see John Elias e-mail attached). 5. Change Exhibit L1.01 to "Detailed" Landscape Plan. 6. Indicate Monument Sign letter materials on plan. 7. Abide by Departmental comments (Parks). 8. It appears Monument Sign colors have been reversed, please clarify. 9. Eliminate the Fire Department connection closest to Sandy Lake Road. Page 3 of 4 Item#7 ALTERNATIVES 1) 2) 3) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request T'ake under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) 6) 7) Site Plan Exterior Elevations (Sheet A1.01) Series of Trade Center Drawings (Sheets PDL0.00, PDL1.01) Tree Survey Field Data Perspective Drawing 8 '/2" by 11" Overall Concept Plm~ Departmental comments (Parks) .01,.02, L1.01, .02, .03, Page 4 of 4 Item//7 CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Coppell Trade Center~ Lot 1~ Block 1~ Minor Plat P & Z HEAR1NG DATE: C.C. HEARING DATE: November 18, 2004 December 14, 2004 STAFF REP.: Gary L. Sieb, Director of Planning LOCATION: Along the north side of Sandy Lake Road, between Northpoint Drive and the extension of Freeport Parkway. SIZE OF AREA: 40.6 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Minor Plat approval. APPLICANT: Page 1 of 3 Coppell Sandy Lake Industrial, LP (Owner) Al Sorrels 5055 Keller Springs Rd. Suite 300 Addison, Texas 75001 (972) 280-8355 Fax (972) 241-7955 Macatee Engineering (Engineer) Dayton Macatee 6440 N. Central Expressway Suite 414 Dallas, Texas 75206 (214) 373-1180 Fax (214) 373-6580 Item #8 Merriman Associates (Architect David Masters 300 N. Field Street Dallas, Texas 75202 (214) 987-1299 Fax (214) 987-2138 HISTORY: There has been no recent development history on the subject tract. TRANSPORTATION: Sandy Lake Road is shown as a C4D/6, four-lane divided roadway in a 110-foot right-of-way with construction to begin in early 2005. SURROUNDING LAND USE & ZONING: North - vacant: LI (Light Industrial) South - vacant; PD-194-LI (Planned Development for industrial uses) East - vacant; LI (Light Industrial) West - vacant; LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for light industrial and showroom uses. DISCUSSION: This is a Minor Plat request on 40 acres of property which will eventually contain roughly 650,000-square feet of warehousing space in four separate buildings. The first phase of development indicates an approximate 196,000-square-foot building being constructed along the east side of this 40-acre parcel. A conceptual PD was requested on the entire 40 acres with approximately 13 acres requesting a detailed plan approval. The 196,000-square-foot building will be constructed on this 13-acre first phase site. In general, this request for plat approval is in good order. It complies with our subdivision regulations and with the exception of the title statements and signature blocks which need placement alteration and additions (see condition below), it is acceptable. Page 2 of 3 Item #8 There are several engineering concerns that will be addressed during later phases of engineering review. Engineering's comments are included here to provide the applicant with a "heads up" of engineering, drainage, water, and fire vault concerns which must be addressed. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of this Minor Plat, subject to the following conditions: 1. Prepare title, signature and additions statements as outlined in the Coppell Subdivision Regulations. 2. Abide by Engineering's comments (attached) ALTERNATIVES 1) 2) 3) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request ATTACHMENTS: 1) Minor Plat document 2) Departmental comments (Engineering) Page 3 of 3 Item//8