Loading...
SS9901-CS041104T H E C I T Y O F COl'FELL November 4, 2004 Les Whitman, General Mgr. S.J. Louis Construction of Texas 520 S. Sixth Street P.O. Box 834 Mansfield, TX 76063 Deforest Road Lift Station Improvements Force Main Lines "A" & "B" Project # SS 99-01 Final Acceptance Dear Mr. Whitman: Representatives of the City of Coppell have confirmed a final inspection of utilities for the referenced project. The required two-year maintenance bond has been received and is in effect as of October 20, 2004. Maturity of the bond will be two years from that date. An inspection will be conducted before the expiration date of the bond and you will be contacted if any repairs are warranted under the terms of the bond. Thank you for your cooperation during the construction of this project. Sincerely, Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Assistant Director of Public Works