Loading...
Freeport NIP(8.0)-LR041124Client: Project: Services: 'neers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Freeport XI &X~ Coppell, Texa~ 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 222867 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECmCATION REQUIREMENTS 4000 psi ~ 28 Day~ 5" maximum 3% - 5% ASTM C-172 ASTM C-31 ,x~i ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 11/13/2004 (inches) WEATHER CONDITIONS: Clqg~ 4.75 TIME SAMP~: 5:02am -; ;' BATCH TIME: 4:304m a,-,;[EMP~TURE (F)- 4~~ 49 F CONCRETE: 65 F I tlk,~K NO: 182'j TICK~I~O~ 756579 · %~' AIR CONTENT {%): 3.8 ' UNi!~EIGItT(pcf}: NA OyEiI[ALL pLACEMENT LOCATION: , ' h 50' wide, m~d .L00~l~m southwest Paving 25' from southwest comer. 420 gomg nort ~ ..~' corner, 500' going north, 50' w de ~,, S~MPLE LOCATION: REPo~T OF TESTS Concrete Compressive Cylin ~[ff' x 12" 95' from southwest comer going north, 10' east on paving MAXIMUM COMPRESSIVE Cx~]~]{3ND ER STRENGTH FRACTURE MARKED DATE AGE DIAMETER AREA LOAD SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 11/20/2004 7 6.00 28.26 ~ 4530 Unbonded Cap 1 2 12/11/2004 28 0.00 0.00 Unbonded Cap 1 3 12/11/2004 28 0.00 0.00 , Unbonded Cap 1 4 Hold 0~ LYMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibili~ for variation in qualiiy re of sim ar subject matter provided by persons or conditions over which we have no control. Our letters and (compos tion, appearance performance, e[c) or any other featu . .' .... ~ ......~-~oa ~xce*,t in fix without the written approval of Rone Engineers, Ltd. Pa~,e I of ? Client: Ineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas 8908 Ambas*ador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Services: Report No.: 222867 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%}: TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SL~PPLIER: Southern Star PLA2qT: 27 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5" maximum 3%-5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 ex~ptgl2 MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 11/13/2004 (inches) WEATHER CONDITIONS: Cloudy 5.0 TIME SAMPLED: 5:38am BATCHTIME: 5:00am TEMPERATURE (F)- AIR 50 F CONCRETE: 65 F TRUCK NO: 8 TICKET NO: 756587 AIR CONTENT (%): 3.9 UNITWE1GHT(pci~: NA OVERALL PLACEMENT LOCATION: Paving, 25' fi.om southwest comer, 420' going north 50' wide, and 1000' from southwest comer, 500' going north, 50' wide SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 110' from southwest comer going north, 25' east on paving CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 2 1 11/20/2004 7 6.00 28.26 129820 4590 Unbonded Cap 2 2 12/11/2004 28 0.00 0.00 Unbonded Cap 2 3 12/11/2004 28 0.00 0.00 Unbonded Cap 2 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared b~ed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject manet provided by persons or conditions over which we have no conltol. Our letlers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01SS Page2 of 7 RonE Client: ineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XI1 Coppell, Texas 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houstom TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 222867 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star pLP~NT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" maximum 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 A STM C- 1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 1 1/13/2004 (inches) WEATHER CONDITIONS: Cloudy 5.5 TIME SAMPLED: 6:17am BATCHTIME: 5:59ali1 TEMPERATURE (F)-AIR 50 F CONCRETE: 63 E TRUCK NO: 93 1 TICKET NO: 756600 AIR CONTENT (%): 4.1 UNITWEIGHT(pc0: NA OVERALL PLACEMENT LOCATION: Paving, 25' from southwest comer, 420' going north 50' wide, and 1000' from southwest comer, 500' going north, 50' wide SAMPLE LOCATION: REPORT OF TESTS 215' from southwest comer going north, 20' east on paving Concrete Compress'ye Cylinder 6' x 12" CYLENDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 3 1 11/20/2004 7 6.00 28.26 122540 4330 Unbonded Cap 3 2 12/11/2004 28 0.00 0.00 Unbonded Cap 3 3 12/11/2004 28 0.00 0.00 Unbonded Cap 3 3 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letrers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01SS Page 3 of 7 Rom ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: {214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XI1 Coppell, Texas Services: Report No.: 222867 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECTDATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5" maximum 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: ] 1/13/2004 (inches) WEATHER CONDITIONS: Cloudy 6.5 TIME SAMPLED: 7:44am BATCHTIME: 7:02am TEM/'ERATURE (F)- AIR 5 1 F CONCRETE: 67 F TRUCK NO: 1015 TICKET NO: 756609 AIR CONTENT (%): 4.1 UNITWE1GHT(pcl): NA OVERALL PLACEMENT LOCATION: Paving, 25' from southwest comer, 420' going north 50' wide, and 1000' from southwest comer, 500' going north, 50' wide SAMPLE LOCATION: REPORT OF TESTS 320' from southwest comer going north, 32' east on paving Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED MAXIMUM COMPRESSIVE DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 4 I 11/20/2004 7 6.00 28.26 121640 4300 Unbonded Cap 4 2 12/11/2004 28 0.00 0.00 Unbonded Cap 4 3 12/11/2004 28 0.00 0.00 Unbonded Cap 4 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd Pace 4 of 7 RoneEr ine ers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 222867 Project No.: 049245 Date of Service: 1 I/I3/2004 Report Date: 11/24/2004 Project: Freeport X1 & XII Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" maximum 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 11/13/2004 (inches) WEATHER CONDITIONS: Cloudy 6.0 TIME SAMPLED: 8:19am BATCH TIME: 8:10aln TEMPERATURE (F) - AIR 51 F CONCRETE: 66 v TRUCK NO: 648 TICKET NO: 756618 AIR CONTENT (%): 3.9 UNITWEIGHT(pcl): NA OVERALL PLACEMENT LOCATION: Paving, 25' fxom southwest comer, 420' going north 50' wide, and 1000' from southwest comer, 500' going north, 50' wide SAMPLE LOCATION: REPORT OF TESTS 30' from southwest comer of#2 placement going 20' east on paving Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.im) (lbs. force) (psi) TYPE 5 1 11/20/2004 7 6.00 28.26 116320 4110 Unbonded Cap 5 2 12/11/2004 28 0.00 0.00 Unbonded Cap 5 3 12/11/2004 28 0.00 0.00 Unbonded Cap 5 4 Hold Water added at site: 5 gallons LIMITATIONS: The test resulls presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, ere) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Pa~e5 of 7 Client: Duke Realty Services, LP Mr. Brian Slraley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: FreeportXI& XII Coppell, Texas :rs 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Services: Report No.: 222867 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Obtain samples of fi.esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONIRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" maximum 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMe PLACEMENT DATE: 11/13/2004 (inches) WEATHER CONDITIONS: Cloudy 5.75 TIME SAMPLED: 9:31am BATCHTIME: 8:50altl TEMPERATURE (F)- AIR 51 F CONCRETE: 65 F TRUCK NO: 837 TICKET NO: 608407 AIR CONTENT (%): 3.9 UNITWEIGHT(pc0: NA OVERALL PLACEMENT LOCATION: Paving, 25' from southwest comer, 420' going north 50' wide, and 1000' from southwest comer, 500' going north, 50' wide SAMPLE LOCATION: REPORT OF TESTS 100' fi.om southwest comer of #2 placement go'rig 10 east on paving Concrete Compress've Cylinder 6' x 12" CYLINDER MARKED DATE AGE SET NO. TESTED (days) MAXIMUM COMPRESSIVE DIAMETER AREA LOAD STRENGTH FRACTURE (inches) (sq.in.) (lbs. force) (psi) TYPE 6 1 11/20/2004 6 2 12/11/2004 6 3 12/11/2004 6 4 Hold Water added at site: 10 gallons 7 6.00 28.26 112910 3990 Unbonded Cap 28 0.00 0.00 Unbonded Cap 28 0.00 0.00 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maller provided by persons or conditions over which we have no control. Our le~ers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Pave 6 of 7 Client: lineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort %Vorth~ TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Services: Report No.: 222867 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" maximum 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 REPORT MIXDESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 11/13/2004 (inches) WEAmER CONmTIONS: Cloudy 6.25 TIME SAMPLED: 10:17am BATCHT1ME: 9:37am TEMPERATURE (F) - Am 52 F CONCRETE: 64 F TRUCK NO: 1883 TICKET NO: 756633 AIR CONTENT (%): 4.0 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving, 25' fi.om southwest comer, 420' going north 50' wide, and 1000' fi.om southwest comer, 500' going north, 50' wide SAMPLE LOCATION: OF TESTS 210' from southwest comer of#2 placement, going 30' east on paving Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE AGE DIAMETER SET NO. TESTED (days) (inches) 7 1 11/20/2004 7 7 2 12/11/2004 28 7 3 12/11/2004 28 7 4 Hold Water added at site: lO gallons Technician: Kent Reiser Report Distribution: (1) Duke Realty Services, LP ( 1 ) Extranet (1) City of Coppell (1) City of Coppell MAXIMUM COMPRESSIVE AREA LOAD STRENGTH FRACTURE (sq.in.) (lbs. force) (psi) TYPE 6.00 28.26 111550 3940 Unbonded Cap 0.00 0.00 Unbonded Cap 0.00 0.00 Unbonded Cap Started: 3:30am Finished: 10:30am Scott ¥ arson, AET CMT Operations Manager LI~dTATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject mal~er provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. n~q Page 7 of 7 gc Client: ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 222866 Project No.: 049245 Date of Service: 11/13/2004 Report Date: 11/24/2004 Proiect: Freeport XI & XII Coppell, Texas Obtain samples of fi-esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Construction CONCRETE SUPPLIER: SouthelTl Star PL~T: NA SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP (in): 3" - 5" AIR ('/.): NA TEST METHOD: ASTM C-172 ASTM C-31 ~x~ ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-1231 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: NA PLACEMENT DATE: 11/13/2004 WEATHER CONDITIONS: Cloudy TIME SAMPLED: ll:45am BATCHTIME: NA TEMPERATURE (F) - AIR 54 F CONCRETE: 68 F TRUCKNO: NA TICKET NO: NA AIRCONTENT(%): 2.3 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Tilt wall panels 14, 18, and 20 MEASURED SLUMP (inches) 4.75 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Panel 18 CYLENDER MARKED DATE SET NO. TESTED 1 1 11/20/2004 1 2 12/11/2004 1 3 12/11/2004 1 4 Hold Technician: Kent Reiser Report Distribution: (1) Duke Realty Services, LP (1) Extranet (1) City of Coppell (1) CiW of Coppall MAXIMUM COMPRESSIVE AGE DIAMETER AREA LO~D STRENGTH (days) (inches) (sq.in.) (lbs. force) (psi) 7 6.00 28.26 28 0.00 0.00 28 0.00 0.00 Started: 1 l:00am FRACTURE TYPE 141570 5010 Unbonded Cap Unbonded Cap Unbonded Cap Finished: 12:45pm K. Scott Watson, AET CMT Operations Manager LlYAITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality other feature of similar subject matter prov ded by persons or conditions over which we have no control. Our letters and (composition, appearance, performance, etc.) or any ...... ~ ~a ...... * in full without the written approval of Rone Engineers, Ltd reports are for the exclusive use of the clients to whom they are addressea aha snml not oe reprouu~u ,x~p, Page I of I