Loading...
Freeport NIP(8.0)-LR041206ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Report No.: 223318 Project No.: 049245 Date of Service: 11/24/2004 Report Date: 12/06/2004 Services: Obtain samples of f~esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PtO2~T: 22 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days STRENGTH: SLUMP (in): AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 except 9 I 2 MEASURED MIX DESIGN I.D.: 9349 SLUMP PLACEMENT DATE: 11/24/2004 (inches) WEATHER CONDITIONS: Cloudy 3.5 TIME SAMPLED: 8:30am BATCHTIME: NA TEMPERATURE (F) ~ AIR 42 F CONCRETE: 65 F TRUC~:NO: 1805 TICKETNO: 326743 AIR CONTENT (%): NA UNIT WEIGHT (peri: NA OVERALL PLACEMENT LOCATION: Leave-out in Building XI, south wall between gridlines F/01 to F/08 and F/09 to F/I3; east wall between ~idlines F/01 to D/01 SAMPLE LOCATION: F/01 to F/06 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE SET NO. TESTED MAXIMUM AGE DIAMETER AREA LOAD (days) (inches) (sq.in.) (lbs. force) COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 1 1 12/01/2004 1 2 12/22/2004 1 3 12/22/2004 1 4 Hold Water added at site: Technician: Bobby Robinson Report Distribution: (1) Duke Really Services, LP (1) Exttanet (i) City of Coppell (1) Cily of Coppell 7 6.00 28.26 119270 28 0.00 0.00 28 0.00 0.00 5 gallons Started: 8:15am Finished: 9:45am 4220 Unbonded Cap Unbonded Cap Unbonded Cap K. Scott Watson, AET CMT Operations Manager LIMJTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We a~sume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd 01SS Page 1 ofl