ST9905-CS041209T H E C I T ¥ 0 Ir COl'FELL December 9, 2004 Mr. Rez Samari Verizon Communications 2094 McGee Lane Lewisville, Texas 75077 RE: Bethel Road I ST 99-05 Utility Relocations Mr. Samari: The Bethel Road I project consists of both roadway and channel improvements. The existing two-lane asphalt road will be replaced with a four-lane divided roadway. Right-of-way acquisition for the roadway portion, from the west city limits to east of Freeport Parkway is complete. A 95% complete set of plans and a Right-of-Way Use Perrnit are enclosed. Verizon Communications submitted a permit for the utility relocations on this project in June 2003. Please review the plans to ensure that your relocation plans are still current and complete a new permit form for submittal to the city. Utility relocations can be initiated upon approval of the pen:nit. The channel improvements are generally outside of the roadway improvements. They begin east of Freeport Parkway and south of Bethel Road and extend in a northeasterly direction. A new four-barrel box culvert will be constructed across an unimproved section of Bethel Road as part of this project. The city is working with the project consultant on the design of the channel and with the United States Corps of Engineers on obtaining a permit for the construction. Plans will be forwarded to you once they are complete. One parcel of right-of-way will need to be acquired for the channel construction. This project Is scheduled to advertise in the 1't quarter of 2005. Should you have any questions or need any additional information, please advise. Sincerely, Suz(n ~. Taylor C1P[Go~rdinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: ~aD~lor ¢~_c op p e_ll .t x ._u~ Enclosures T H £ C I T Y 0 F COPPELL December 9, 2004 Mr. Doug Brewer Atmos Energy 200 N. Ector Drive Euless, Texas 76039 RE: Bethel Road I ST 99-05 Utility Relocations Mr. Brewer: The Bethel Road I project consists of both roadway and channel improvements. The existing two-lane asphalt road will be replaced with a four-lane divided roadway. Right-of-way acquisition for the roadway portion, from the west city limits to east of Freeport Parkway is complete. A 95% complete set of plans and a Right-of-Way Use Permit are enclosed. Please review the plans to determine if Atmos Energy has any facilities impacted by the proposed improvements. Utility relocations can be initiated upon approval of the relocation plans and permit. The channel improvements are generally outside of the roadway improvements. They begin east of Freeport Parkway and south of Bethel Road and extend in a northeasterly direction. A new four-barrel box culvert will be constructed across an unimproved section of Bethel Road as part of this project. The city is working with the project consultant on the design of the channel and with the United States Corps of Engineers on obtaining a permit for the construction. Plans will be forwarded to you once they are complete. One parcel of right-of-way will need to be acquired for the channel construction. This project is scheduled to advertise in the st 1 quarter of 2005. Should you have any questions or need any additional information, please advise. Sincerely, ylor ator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: st aylg~(~a~c i.c opA~e Il. tx .us Enclosures COPPELL December 9, 2004 Mr. Roger Cloninger McLeod USA 15601 N. Dallas Parkway, Suite 700 Dallas, Texas 75001 RE: Bethel Road I ST 99-05 Utility Relocations Dear Mr. Cloninger: The Bethel Road I project consists of both roadway and channel improvements. The existing two-lane asphalt road will be replaced with a four-lane divided roadway. Right-of-way acquisition for the roadway portion, from the west city limits to east of Freeport Parkway is complete. A 95% complete set of plans and a Right-of-Way Use Permit are enclosed. Please review the plans and let me know, either way, if McLeod USA has any facilities impacted by the proposed improvements. Utility relocations can be initiated upon approval of the relocation plans and permit. The channel improvements are generally outside of the roadway improvements. They begin east of Freeport Parkway and south of Bethel Road and extend in a northeasterly direction. A new four-barrel box culvert will be constructed across an unimproved section of Bethel Road as part of this project. The city is working with the project consultant on the design of the channel and with the United States Corps of Engineers on obtaining a permit for the construction. Plans will be forwarded to you once they are complete. One parcel of right-of-way will need to be acquired for the channel construction. This project is scheduled to advertise in the 1st quarter of 2005. Should you have any questions or need any additional information, please advise. Sincerely, Suzan . Taylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stavlorCd~ci.coppelt.tx.us Enclosures COPPELL December 9, 2004 Mr. Tim Norris OnFiber Carrier Services 1820 N. Glenville Drive, Suite 114 Richardson, Texas 75081 RE: Bethel Road I ST 99-05 Utility Relocations Dear Mr. Norris: The Bethel Road I project consists of both roadway and channel improvements. The existing two-lane asphalt road ;vill be replaced with a four-lane divided roadway. Right-of-way acquisition for the roadway portion, from the west city limits to east of Freeport Parkway is complete. A 95% complete set of plans and a Right-of-Way Use Permit are enclosed. Please review the plans and let me know, either way, if OnFiber Carrier Services has any facilities impacted by the proposed improvements. Utility relocations can be initiated upon approval of the relocation plans and permit. The channel improvements are generally outside of the roadway improvements. They begin east of Freeport Parkway and south of Bethel Road and extend in a northeasterly direction. A new four-barrel box culvert will be constructed across an unimproved section of Bethel Road as part of this project. The city is working with the project consultant on the design of the channel and with the United States Corps of Engineers on obtaining a permit for the construction. Plans will be forwarded to you once they are complete. One parcel of right-of-way will need to be acquired for the channel construction. This project is scheduled to advertise in the 1st quarter of 2005. Should you have any questions or need any additional information, please advise. Sincerely, Taylor dinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: staylor(a!ci.coj)pell.lx.u5 Enclosures December 9, 2004 Mr. Richard Brewster TXU Electric Delivery Company 301 S. Harwood Street, 6 South Dallas, Texas 7520 l RE: Bethel Road I ST 99-05 Utility Relocations Dear Mr. Brewster: The Bethel Road I project consists of both roadway and channel improvements. The existing two-lane asphalt road will Be replaced with a four-lane divided roadway. Right-of-way acquisition for the roadway portion, from the west city limits to east of Freeport Parkway is complete. A 95% complete set of plans and a Right-of-Way Use Permit are enclosed. Please review the plans to determine if TXU Electric Delivery has any facilities impacted by the proposed improvements. Utility relocations can be initiated upon approval of the relocation plans and permit. The channel improvements are generally outside of the roadway improvements. They begin east of Freeport Parkway and south of Bethel Road and extend in a northeasterly direction. A new four-barrel box culvert will be constructed across an unimproved section of Bethel Road as part of this project. The city is working with the project consultant on the design of the channel and with the United States Corps of Engineers on obtaining a permit for the construction. Plans will be forwarded to you once they are complete. One parcel of right-of-way will need to be acquired for the channel construction. This project is scheduled to advertise in the 1st quarter of 2005. Should you have any questions or need any additional information, please advise. Sincerely, Su aylor CIP Cso~dinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stavlor(a)ci co22petl.tx.us Enclosures