Loading...
ST9302-CS000517FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 May 17, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-31IF Dear Mr. Griffin: Enclosed for your review is a revised schedule for the referenced project reflecting the current state of the project and our proposed sequence of work to complete the project. It is our intent to attempt to accelerate the phase 2 and phase 4 work in an effort to start the DWU lowerings during this summer and be prepared to make the connections as soon as the DWU work window opens. This schedule indicates that the project, less the MacArthur intersection, will be completed in June 2001. If you have any questions regarding this schedule, don't hesitate to contact our office. Sincerely, ~C~s~n Company Robert D. Weber Project Engineer Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER