SS9901-CS040621SSO ot
From:
To:
Date:
Subject:
"Cooper, Erika" <erika.cooper@tcb.aecom.com>
<kgriffin@ci.coppell.tx.us>
6/21/2004 3:20:42 PM
DeForest and Sandy Lake Lift Stations
Ken,
Since construction on Lines A&B is underway and construction on Line D
is beginning, we recommend the City advertise and bid the lift stations.
This will alow the Ift station projects to be completed at approximately
the same time as the force main projects. The lift station construction
documents are complete and ready for reproduction except for the
following items to be added in the specifications:
1. Time and date for bid opening
2. Time and date for pre-bid conference
3. City of Coppell Bid No.
Once we have the above information, we will provide copies of the
construction documents to the City and will be prepared to distribute
plans and specifications to contractors. We also plan to call several
contractors who perform this type of work regarding this project.
Thanks,
Erika
Erika Cooper, P.E.
Turner Collie & Braden, Inc.
17300 Dallas Parkway - Suite 1010
Dallas, Texas 75248-1145
972-735-3000
Fax 972-735-3001
Direct 972-735-3056
Email erika.cooper@tcb.aecom.com
CC: "Sugg, Ted" <ted.sugg@tcb.aecom.com>