RC Townhomes-LR04111715:59 9723599i16
LUSTIG FAMILY
PAGE 03
. MACTEC Engineering
and Consulting
Port Worth, Texas 76115-7123
REPORT OF
IN-PLACE DENSITY
CLIENT: J.R~ ROSE DEVELOPMENT
410 SPINNAKER DR.
A~LEN, TX 75013
PROJECT: RIV~RCHASE TOWNHOMES ADDITIONS
PAGE 1 OP i
P~OJECT NO.: 9023912
REPORT NO.: 408412
DAT~ OP $£RV[CE: 11/16/2004
A~T~ORIZ ATION:
RI~ORT DATE: 11/17/2004
~I~R~rI~E~,· ~erform in-piaee~emeity an~ moist~e Oo~=mn= ~tm to detexm~% the dmgrem
of field compaction,
CONTRACTOR: UNDERGROUND UTILITIES
METHOD OP TEST:
DENSITY: ASTM D2922
MOt$1~/RE: ASTM D3017
SPECIPICAT~ON:
DEN$1TYI 9 ~ %
MOlS~: "2% TO +4% 0F OPT-
~ST OF
FILL 24" STO~ D~IN
RED/BR/q.& DK BRN.Sb/4D/CLYw/GRV
PROJECT DATA
GAUGE: NA
GAUGE SPATIAL NO.:
ST,~ARID COUNTS
MOI~ * ~NT~A P~VIOUS: NA
DEN~ - C~T:~A ~VIOUS: NA
~TMOD~: Direct Transmission
PROBE D~ (h.b 6
MQIS~D~8~' ~LA~ONS
~OI~ % DENSI~ ~f ~RT NO
TEST
NO ...... LOCA~ON
LINE A STA 3+50 FINAL
2. LINE A STA 5*20 FINAL
REPORT OF TESTS
FIELD OPTll%4UM FIELD DENSITY MAXIMUM
MOISTURE MOISTURE (1~0 DENSITY
16.6 16.0 126.2 108.2 110-8
15.9 16.0 127.0 109.6 110-5
Test results on this report meet project
. specif£=ations ,a~. noted abo=e~.
DENSITY
99
Technician: Steve Campbell
Repor~ Di~ribution:
Started: 03:00PM
Stopped: 06:00PM
Tim Begole, CET.