Loading...
RC Townhomes-LR04111715:59 9723599i16 LUSTIG FAMILY PAGE 03 . MACTEC Engineering and Consulting Port Worth, Texas 76115-7123 REPORT OF IN-PLACE DENSITY CLIENT: J.R~ ROSE DEVELOPMENT 410 SPINNAKER DR. A~LEN, TX 75013 PROJECT: RIV~RCHASE TOWNHOMES ADDITIONS PAGE 1 OP i P~OJECT NO.: 9023912 REPORT NO.: 408412 DAT~ OP $£RV[CE: 11/16/2004 A~T~ORIZ ATION: RI~ORT DATE: 11/17/2004 ~I~R~rI~E~,· ~erform in-piaee~emeity an~ moist~e Oo~=mn= ~tm to detexm~% the dmgrem of field compaction, CONTRACTOR: UNDERGROUND UTILITIES METHOD OP TEST: DENSITY: ASTM D2922 MOt$1~/RE: ASTM D3017 SPECIPICAT~ON: DEN$1TYI 9 ~ % MOlS~: "2% TO +4% 0F OPT- ~ST OF FILL 24" STO~ D~IN RED/BR/q.& DK BRN.Sb/4D/CLYw/GRV PROJECT DATA GAUGE: NA GAUGE SPATIAL NO.: ST,~ARID COUNTS MOI~ * ~NT~A P~VIOUS: NA DEN~ - C~T:~A ~VIOUS: NA ~TMOD~: Direct Transmission PROBE D~ (h.b 6 MQIS~D~8~' ~LA~ONS ~OI~ % DENSI~ ~f ~RT NO TEST NO ...... LOCA~ON LINE A STA 3+50 FINAL 2. LINE A STA 5*20 FINAL REPORT OF TESTS FIELD OPTll%4UM FIELD DENSITY MAXIMUM MOISTURE MOISTURE (1~0 DENSITY 16.6 16.0 126.2 108.2 110-8 15.9 16.0 127.0 109.6 110-5 Test results on this report meet project . specif£=ations ,a~. noted abo=e~. DENSITY 99 Technician: Steve Campbell Repor~ Di~ribution: Started: 03:00PM Stopped: 06:00PM Tim Begole, CET.