ST9302-CS000428352-3201 ~/~ ~ TELEPHONE (214) 358-6551 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 April 28, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Grif£m: As requested, we have reviewed our previously submitted prices for the reconstruction of the MacArthur Road and Sandy Lake Road intersection as shown on the set of plans dated October 29, 1999. Our revised prices for the work identified on that set of plans are enclosed for your review and approval. We have not quoted the four street light poles because the light poles on the remainder of the project will be done by others; however, we have quoted the conduit for the street lights. Because of the phased nature of the intersection, coordination of the conduit installation in the intersection will be more efficient utilizing an EBCC subcontractor rather than by waiting for a TXU subcontractor: AdditionallY, we'have omitted the 2" HMAC transition pavement and modified the lime stabilization from six'inche~ to eight inches based upOfi ~ohr dffcCtioh. --.' ' ~ ...... . ..~ As discussed in our meeting on April 25, 2000, the higher cost associated with this work is duc solely to thc nature of the intersection. As you are well aware, this intersection is heavily traveled and cannot be closed to complete the work; therefore, the excavation, lime stabilization, and concrete paving will need to be completed in four to six phases. Our current project doesn't contain an intersection of that nature and is a relatively "clean" project when compared to the work associated with the MacArthur/Sandy Lake intersection. It is our intent to install as much of the storm sewer and sanitary sewer as possible before closing any portion of the intersection. We would then concentrate our efforts on the two eastern quadrants of the intersection with each quadrant taking four to six weeks to complete. We will need an additional 120 calendar days to complete this work. If you have any questions regarding this infoxxnation, don't hesitate to contact our office. rely, °Wr~e~~i Wany Project Engineer xc.' Michael G. DeMotte, Kimley-H0rnand Associates, Inc., ~801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUALOPPORTUNITYEMPLOYER l MACARTHUR BOULEVARD INTERSECTION IMPROVEMENTS itEM DESCRIPTION UNIT QUANTITY PRICE EXTENSION 1 Mobilization LS 1.00 $226,000.00 $226,000.00 2 ROW Preparation LS 1.00 $60,000.00 $60,000.00 3 Field Office LS 1.00 $10,000.00 $10,000.00 4 Rem Concrete and HMAC SY 6,207.00 $4.00 $24,828.00 5 Rem Concrete Curb LF 1,267.00 $2.50 $3,167.50 6 Rem Headwall EA 4.00 $500.00 $2,000.00 7 Rem Existing RCP LF 426.00 $10.00 $4,260.00 8 Rem Guardrail LF 90.00 $10.00 $900.00 9 Rem Concrete Flumes LF 69.00 $50.00 $3,450.00 10 Rem Brick/Stone Wall LF 530.00 $10.00 $5,300.00 11 Rem Electrical Box EA 2.00; $200.00 $400.00 12 Rem Grate Inlet EA 1.00 $500.00 $500.00 13 Unclassified Street Excavation CY 7,513.00 $3.00 $22~539.00 14 8" Limed Subgrade SY 9,502.00 $1.35 $12,827.70 15 Hydrated Lime TN 185.00 $85,00 $15,725.00 16 8" Concrete Pavement SY 6,449.00 $24.88 $160,451.12 17 6" Concrete Curb LF 3,202.00 $1.50 $4,803.00 18 2" TY D HMAC Transition SY 898.00 NO BID NO BID 19 6" HMAC Transition Pavement SY 931.00 $30.00 $27,930.00 20 6" TY D HMAC Curb LF 259.00 $15.00 $3,885.00 21 4" Concrete Sidewalk SY 298.00 $20.00 $5,960.00 22 Concrete Pavers SY 2,165.00 $58.00 $125,570.00 23 Concrete Driveways SY 356.00 $30.00 $10,680.00 24 HMAC Driveways SY 158.00 $50.00 $7,900.00 25 Concrete Header LF 100.00 $15.00 $1,500.00 26 Metal Beam Guardrail LF 75.00 $20.00 $1,500.00 27 Laydown Terminal EA 1.00 $1,100.00 $1,100.00 28 18" CL III RCP LF 436.00 $32.00 $13,952.00 29 21" CL III RCP LF 129.00 $35.00 $4,515.00 30 24" CL III RCP LF 232.00' $41.00 $9,512.00 31 27" CL III RCP LF 138.00 $46.00 $6,348.00 32 33" CL III RCP LF 122.00 $60.00 $7,320.00 33 10" PVC Sewer LF 20.00 $48.00 $960.00 34 21" PVC Sewer LF 548.00 $140.00 $76,720.00 35 Recessed 6' Curb Inlet EA 2.00 $1,700.00 $3,400.00 36 Recessed 8' Curb Inlet EA 2.00 $2,000.00 $4,000.00 37 Recessed 10' Curb Inlet EA 1.00 $2,100.00 $2,100.00 38 Recessed 14' Curb Inlet EA 1.00 $3,000.00 $3,000.00 39 Standard 10" Curb Inlet EA 2.00 $2,100.00 $4,200.00 40 Standard Y Inlet (3 sides) EA 2.00 $2,200.00 $4,400.00 41 Standard 6' TY A Storm Drain Manhole EA 2.00 $2,000.00 $4,000.00 42 Standard Manhole Extra Depth (>6') EA 5.00 $150.00 $750.00 43 Standard Sanitary Sewer Manhole (6') EA 4.00 $1,500.00 $6,000.00 44 Sanitary Manhole Extra Depth (>6') EA 10.00 $150.00 $1,500.00 45 24" TY C Headwall EA 1.00 $2,000.00 $2,000.00 46 33" TY C Headwall EA 1.00 $2,500.00 $2,500.00 47 Adjust Existing Sanitary Sewer Manhole EA 4.00 $850.00 $3,400.00 48 Adjust Exiisting Water Meter Valve Boxes EA 10.00 $120.00 $1,200.00 49 =Traffic Signal Installation - MacArthur Blvd. LS 1.00 $210,000.00 $210,000.00 50 2" PVC Conduit (Direct Buried) LF 850.00 $3.50 $2,975.00 51 30'-0" Sq Painted Pole w/2-250 W HPS Fixtures & Foundation E^ 4.00 NO BID NO BID 52 Temporary Roadway LS 1.00 $50,000.00 $50,000.00 53 4" Topsoil SY 3,669.00' $2.50 $9,172.50 54 Hydromulch SY 3,669.00 $1.25 $4,586.25 55 Storm Water Prevention Plan (SWPPP) LS 1.00 $12,500.00 $12,500.00 Pavement Markings LS 1.00 $17,500.00 $17,500.00 TOTAL $1,211,687.07