Loading...
Sherrill L3-CS041210 (2)Allen & Ridinger Consulting, Inc. December 10, 2004 Ms. Charlene La Mattina, EIT Graduate Engineer City of Coppell 255 Parkway Coppell, Texas 75019 · 109 W. Main St. Lewisville, Texas 75057 Re: Comment Responses for Sherrill Acres Addition, Lot 3, block 1 Dear Ms. La Matinna: The following list is our responses to the comments received. Plat 1) Easement has been modified 2) Easement has been modified Site Plan 1) FDC moved to the same side as fire hydrant. Grading Plan 1) Inlets shown and labeled Utility Plan 1) Cleanout provided 2) Gate valve added 3) FDC relocated 4) Valve placed closer to the main Drainage Area Map 1) Colunm added and discharge locations described 2) Area 1 is picked up in existing inlet provided on Lot 2A to the north and area 4 is picked up in existing open backed inlet to the north. 3) Water on eastern and southern portion of the site is picked up to the extent of the back of curb. Existing contours show that this drainage originally went to the south and east. We have picked up a majority of this drainage; however, the existing contours of the site show it to go in that original direction. We have reduced the flow to that direction. 4) Inlets labeled 5) Roof drainage is picked up with gutters and passed through the curb on the south and discharged onto splash blocks on the noxth. · TEL 972 353 8000 FAX 972 353 8011 Allen & Ridinger Consulting, Inc. Storm Sewer Plan & Profile 1 ) "Y" inlet not needed, because of inter on adjacent property. We arc matching pipe size and flow linc so no ma~holc is necessary. Erosion Control Plan 1) Erusion control added. 2) Filter barrier modified 3) Construction enhance added Paving, Water, Sewer, and Storm Sewer Details 1) All detail sheets removed and City details referred to in General Notes Landscape Plan 1) Plan removed from set We appreciate your help on this project. Please call if you have any questions or comments. Thank you, Michael Allen, P.E. President Cc file