TC Bank-CS041214December 14, 2004
David Estopinal
SLI Design, Inc.
Fax 713/465-8555
RE: Town Center Bank
Dear Mr. Estopinal:
A pre-construction conference on the referenced project has been scheduled for
Thursday, December 16, 2004 at 2:00 p.m. in the first floor conference room in Town
Center at 255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3685.
Sincer. ely,
~/~ In ector
Garreth Campbell, Construction sp
Office Phone: 972-304-3685
Fax: 972-304-3570
CC:
Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
John Blacker, P.E., Kimley-Hom, Inc. fax 817/335-5070
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner / owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the fo/lowing
parties:
· Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
· Geotechnical firm
· Project Engineer
· Contractors or subcontractors for excavation, utility, & paving operations
· SWPPP representative