Loading...
St Andrews Est-CS041220COPPELL December 20, 2004 Terry Holmes Holmes Builders 2629 Dickerson Carrollton TX 75007 RE: Construction of Barrier-Free Ramps Dear Mr. Holmes: We received your letter dated October 1, 2004 seeking to delay the construction of the four proposed barrier-free ramps planned for this project. You asked for delay until the construction of the homes for the subdivision takes place. The design submitted is correct, however please adhere to the following conditions: 1. The City will allow construction of the two interior ramps to be delayed until the homes are built on those two lots. 2. The ramps adjacent to Deforest Road must be constructed before final acceptance of the infrastructure portion of the project. This activity should take place so that the maintenance bond will be in effect for those facilities during the 2-year bond period. 3. When the ramps for Lots 18 and 19 are to be constructed, please call this office for inspection services. 4. The ramps at the intersection of Stonewick Ln shall be constructed within the 2-year maintenance period. If you have any questions or comments, please contact me at your convenience. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office: 972-304-7044 Fax: 972-304-3570 CCi Larry Davis, Construction Inspector Greg Jones, Chief Building Official 255 pARKWAY ~r p.O.BOX 9478 ~ CoPPeLL TX 75019 ~ TEL 972/462 0022 ~ FAX 972/304 3673