Coppell Comm 1R3-CS041119COPPELE
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To~
From:
Rick Stull, McFadden & Miller
Jimmie Laxson, McFadden & Miller 972-401-1399
Jake Fulmer, PCI Construction 972-562-2954
Larry Davis, 5onstruction Inspector~/~
Office Phone. (972) 304-3684 ~/~r~
Fax: (972) 304-3570
Date:
RE:
November 19, 2004
Final WALK-THRU for Royal Park (Coppell Commerce Addition,
Lot 1R Block 3) Near Freeport Parkway at Burns Street and Hammond
A walk-thru for paving and drainage and a FOLLOW-UP walk-thru on utilities for the
referenced project is scheduled for:
Tuesday, November 23, 2004 at 9:00 a.m.
Please make sure the facilities are clean and ready for inspection and that all applicable
documents have been submitted. Let me know ifI can be of further assistance.
cc: Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"