ST9905-ES041021Walter Hogg PS
Larry Futerfas
3136 Routh Street, Suite 203
Dallas, Texas 75201-1335
T H E C I T Y 0 F
COPPELL
October 21, 2004
RE:
Bethel Road 1 / Project # ST 99-05
Parcel 3 Right-of-Way
Parcel 3E - Slope Easement
Parcel 3E 1 - Temporary Construction Easement
Dear Mr. Futerfas:
This letter is written as a follow-up my October 11, 2004 letter. In a recent telephone conversation you
l,ad sougllt an additional clarification of the offer. The of~ currently on the table fnr the acquisition of
the necessary right-of-way, slope easement, and temporary construction easement from your property
located along the north side of Bethel Road is as follows:
I. Acquisition of permanent right-of-way at $3.15/sq. ft. x 39,113 sq. ft.
2. Acquisition of slope easement at ($3.15/sq. ft. x 1,268 sq. ft.) x 25%
3. Acquisition of temporary construction easement at ($3.15/sq.ft. x 12,154 sq. ft.) x 5%
4. Construction of approximately 1450' of 8" sanitary sewer line by City of Coppell
(including approximately 200' across the front of your property)
(estimated value $55,000)
5. Extension of 16" waterline from southeast corner of property to southwest
comer of property.
Total Cash Offer
123,206.00
998.00
1,915.00
-55,000.00
$71,119.00
This offer is being made by the City of Coppell to consummate negotiations with you concerning the
acquisition of the above described right-of-way and easements in lieu of condemnation proceedings by
the City of Coppell. The total cash offer paid to you includes and covers any and all damages and claims,
which you may have asserted during condemnation proceedings.
If the above negotiated cash offer of $71,119, the construction of an 8" sanitary sewer line across about
200' of your property, and the extension of the 16" waterline adjacent to your property is acceptable to
you, in lieu of the City of Coppell proceeding with condemnation hearings, then please sign below and
return a copy of this letter to my office. Once a signed copy is received, the process for payment of the
$71,119 can begin. When the check is ready, we can arrange a mutually agreeable time to meet and
notarize the documents in exchange for the check.
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
CC:
Jim Witt, City Manager
Clay Phillips, Deputy City Manager
Robert E. Hager, City Attorney