SS9402A-LR 960401ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR: DATE:
RIVER VALLEY ENTERPRISES
ROCKWALL, TEXAS
04/01/96
PROJECT: GRAPEVINE THREE OURREPORTNO. 95767-12
COPPELL, TEXAS
TEST DATA:
TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATED E PTH~.~.,~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPA~ON COMMENT*
NUMBER % PCF % PCF
43 04/01 FG $ 19.2 104.8 23.1 104 99 1-A
44 04/01 FG 3 19.2 104.8 22.0 103 98 1-A
45 04/01 FG 3 19.2 104.8 22.0 105 100 1-A
TEST LOCATION: SEWER LINE ALONG EAST SIDE OF DENTON TAP
43 STATION 35+00
44 STATION 31+00
45 STATION 33+00
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
* A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respec~fJ~'Q~mitteo~-A
B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS / ALPHA TESTING, INC// --