SS9402A-LR 960124ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR: DATE:
RIVER VALLEY ENTERPRTSES 01/24/96
ROCKWALL, TEXAS
PROJECT: GRAPEVINE THREE OURREPORTNO. 95767-11
COPPELL, TEXAS
TEST DATA:
TEST ~ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
NO. DATEDEPTH~.~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT*
NUMBER % PCF % PCF
40 0]/24 FG-6 2 12.5 115.0 19.1 109 94 1-*
41 01/24 FG-4 2 12.5 115.0 19.4 111 97 !-*
42 01/24 FG-? ? 12.5 115.0 17.3 107 93 1-A
TEST LOCATION: UTILITY LINE
40 AT STATION 19+00 ALONG DENTON TAP RD
41 AT STATION 17+50 ALONG DENTON TAP RD
42 AT STATION 16+00 ALONG DENTON TAP RD
* CITY INSPECTOR ACCEPTED MOISTURE ABOVE SPECIFIED
1. FILL A. TEST RESULTS COMPLY WITH SPECIFICATIONS
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
4. CEMENT TREATED D. RETEST
LIMIT