Loading...
SS9402A-LR 960110ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: RIVER VALLEY ENTERPRISES DATE: 01/10/96 ROCKWALL, TEXAS PROJECT: GRAPEVINE THREE COPPELL, TEXAS OUR REPORT NO. 95767-10 TEST DATA: TEST DATE ~ ELEV,ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DEPTH~'"-.~ NUMBER MOISTURE% DRY PcFDENS~Y MOISTURE% DRY PcFDENSITY COMPACTION COMMENT 16 01/10 FG-11 2 12.5 115.0 12.9 107 93 1-A 17 01/10 FG-10 2 12.5 115.0 12.7 106 92 1-A 18 01/10 FG-9 2 12.5 115.0 13.1 105 92 1-A 19 01/10 FG-8 2 12.5 115.0 13.8 106 92 1-A 20 01/10 FG-7 2 12.5 115.0 13.2 108 94 1-A 21 01/10 FG-6 2 12,5 115.0 13.4 105 91 1-A 22 01/10 FG-5 2 12.5 115.0 14.0 106 92 1-A TEST LOCATION: 16 SANITARY SEWER STATION 7+60 17 SANITARY SEWER STATION 7+60 18 SANITARY SEWER STATION 7+60 19 SANITARY SEWER STATION 7+60 20 SANITARY SEWER STATION 7+60 21 SANITARY SEWER STATION 7+60 22 SANITARY SEWER STATION 7+60 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST Respectf~ ALPHA TESTING, INC. 2209 wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: RIVER VALLEY ENTERPRISES DATE: 01/10/96 ROCKWALL, TEXAS PROJECT: GRAPEVINE THREE OUR REPORT NO. 95767-10A COPPELL, TEXAS TEST DATA: I ~ I ~ELEV, SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH ~.....m MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NUMBER % PCF % PCF 23 01/10 FG-4 2 12.5 115.0 14.0 107 93 1-A 24 01/10 FG-3 2 12.5 115.0 12.6 107 93 1-A 25 01/10 FG-2 2 12.5 115.0 14.2 108 94 1-A 26 01/10 FG-1 2 12.5 115.0 15.1 107 93 1-A 27 01/10 FG 2 12.5 115.0 13.5 105 91 1-A 28 01/10 EG-11 2 12.5 115.0 15.0 105 91 1-A 29 01/10 FG-10 2 12.5 115.0 16.2 107 93 1-A TEST LOCATION: 23 SANITARY SEWER STATION 7+60 24 SANITARY SEWER STATION 7+60 25 SANITARY SEWER STATION 7+60 26 SANITARY SEWER STATION 7+60 27 SANITARY SEWER STATION 7+60 28 SANITARY SEWER STATION 9+50 29 SANITARY SEWER STATION 9+50 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED * A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: RIVER VALLEY ENTERPRISES DATE: 01/10/96 ROCKWALL, TEXAS PROJECT: GRAPEVINE THREE OUR REPORT NO. 95767-10B COPPELL, TEXAS TEST DATA: TEST ~ELEV. SOIL ID O~IMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH ~....~ MOISTURE DRY DENSITY MOISTURE DRY DENSI~ COMPACTION COMMENT* NUMBER % PCF % PCF 30 01/10 FG-9 2 12.5 115.0 14.9 105 91 1-A 31 01/10 FG-8 2 12.5 115.0 14.2 105 91 1-A 32 01/10 FG-7 2 12.5 115.0 14.0 107 93 1-A 33 01/10 FG-6 2 12.5 115.0 13.2 105 91 1-A 34 0]/10 FG-5 2 12.5 115.0 12.9 107 93 1-A 35 01/10 FG-4 2 12.5 115.0 15.2 108 94 1-A 36 01/10 FG-3 2 12.5 115.0 15.0 106 92 1-A TEST LOCATION: 30 SANITARY SEWER STATION 9+50 31 SANITARY SEWER STATION 9+50 32 SANITARY SEWER STATION 9+50 33 SANITARY SEWER STATION 9+50 34 SANITARY SEWER STATION 9+50 35 SANITARY SEWER STATION 9+50 36 SANITARY SEWER STATION 9+50 1. FILL 2, NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: RIVER VALLEY ENTERPRISES DATE: 01/10/96 ROCKWALL, TEXAS PROJECT: GRAPEVINE THREE OUR REPORT NO. 95767-10C COPPELL, TEXAS TEST DATA: TEST ~ELEV. SOIL ID OPTIMUM MAXIMUM LAS IN PLACE IN PLACE PERCENT NO. DATEDEPTH ~'~"a NUMBER MOISTURE% DRYpcFDENSITY MOISTURE% DRYPCFDENSITY COMPACTION COMMENT* 37 01/10 FG-2 2 12.5 115.0 14.3 108 94 1-A 38 01/10 FG-1 2 12.5 115.0 13.4 108 94 1-A 39 01/10 FG 2 12.5 115.0 15.7 106 92 1-A TEST LOCATION: I '37 SANITARY SEWER STATION 9+50 38 SANITARY SEWER STATION 9+50 39 SANITARY SEWER STATION 9+50 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED * A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST