Loading...
SS9402A-LR 951227ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR RIVER VALLEY ENTERPRISES ROCKWALL, TEXAS DATE 12/27/95 PROJECT GRAPEVINE 3 COPPELL, TEXAS OUR REPORT NO. 95767-8 WEATHER: CLEAR DATE: TEMPERATURE RANGE: 3 5 TO: ALPHA Rel~'e~nla#ve: B. C. 50 THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED TO PERFORM FIELD DENSITY TESTING. THE TECHNICIAN DID NOT PERFORM DENSITY TESTS ON FILL MATERIAL SCHEDULED TO BE PERFORMED FOR UTILITY TRENCH. TESTING WAS CANCELLED BECAUSE THE CONTRACTOR WAS NOT READY. THE TECHNICIAN RETURNED TO THE ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR RIVER VALLEY ENTERPRISES ROCKWALL, TEXAS DATE 12/27/95 PROJECT GRAPEVINE 3 COPPELL, TEXAS OUR REPORT NO. 95767-8 WEATHER: CLEAR DATE: TEMPERATURE RANGE: 3 5 TO: ALPHA Rep~e~e~talive: B. C. 50 THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED TO PERFORM FIELD DENSITY TESTING. THE TECHNICIAN DID NOT PERFORM DENSITY TESTS ON FILL MATERIAL SCHEDULED TO BE PERFORMED FOR UTILITY TRENCH. TESTING WAS CANCELLED BECAUSE THE CONTRACTOR WAS NOT READY. THE TECHNICIAN RETURNED TO THE LABORATORY.// ~/~-~fH:=R~.A TES NC