Loading...
SS9402A-LR 951220ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: RIVER VALLEY ENTERPRISES ROCKWALL, TEXAS DATE: 12/20/95 PROJECT: GRAPEVINE THREE OUR REPORT NO. 95767-4 COPPELL, TEXAS TEST DATA: TEST DATE '"-...~LEV. SOIL ID OPTIMUM MAXIMUM LAB IN P~CE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSI~ COMPACTION COMMENT* NO.DEPTH ~ NUMBER % PCF % PCF 1 12/20 FG-10 2 12.5 115.0 16.0 111 97 1-A 2 12/20 FG-4 1 11.5 116.0 9.4 104 90 1-C 3 12/20 FG-2 1 11.5 116.0 11.0 102 88 1-BC TEST LOCATION: 1 24" SANITARY SEWER LINE STATION 0+40 2 15" SANITARY SEWER LINE STATION 1+00 3 15" SANITARY SEWER LINE STATION 2+00 1. FILL * A. TEST RESULTS COMPLY WITH SPECIFICATIONS .Re~ectfully 2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS /×// ~TEST . 3. LIME STABILIZED C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS / ALPHA ~ST~NG~JNC. 4. CEMENT TREATED D. RETEST // 2209 Wisconsin St., Suite 100 [])al!ss, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEOFOR: RIVER VALLEY ENTERPRISES ROCKWALL, TEXAS DATE: PSOJECT: GRAPEVINE THREE OUR REPORT NO, 9576'/-5 COPPELL, TEXAS TEST DATA: 4 12/20 PG-9 2 12.5 115.0 12.4 111 97 1-A 5 12/20 ?G-2 1 11.5 116.0 12.? 111 96 i-AD 6 12/20 ?G-4 1 11.5 llg.0 12.4 111 96 1-AD TEST LOCATION: 24" SANITARY SEWER LINE STATION 0+50 RETEST OF TEST ~3 FROM FIRST REPORT THIS DATE RETEST OF TEST ~2 FROM FIRST REPORT THIS DATE 1, PILL 2, NAT[JRAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED ' A, TEST RESULTS CO~PLY WITH SPECIFICATIONS Re~d,'~ ~./ /~ B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS / / C. MOISTURE DOES NOT COMPLY WiTH SPECIFICATIONS / ALPHA TESTIN~